Shell NewMotion Business Lite View Скачать руководство пользователя страница 15

INSTALLATIEHANDLEIDING – P15 

VERSION 0129NM02INT01 

INSTRUCTION MANUAL – P15  | 

P15

085NM19INT01

EN

DE

5.4 COMMUNICATION CONNECTION PRO 

VIEW

For UTP or NewMotion mobile router connection 
(preferred) proceed with 5.4a, for GPRS connection 
proceed with 5.4b; (refer to B.O. connections overview  
3.4 & 3.5)

5.4A BUSINESS PRO VIEW COMMUNICATION 

CONNECTION(S) (UTP)

Step 1; Feed the UTP cable(s) through the rubber 
stop(s) on the data cable inlet and then connect it to 
the left Ethernet port(s), like indicated in the ‘overview of 
connections’ section;
Step 2; Connect the UTP cable to a internet enabled 
router with DHCP or NewMotion mobile router;

5.4B BUSINESS PRO VIEW COMMUNICATION 

CONNECTION(S) (GPRS)

 

Step 1; Check and make sure signal strength is 
sufficient;

5.5 COMMUNICATION CONNECTION 

BUSINESS LITE VIEW

For Daisy chain configuration proceed with 5.5a, for 
Star configuration proceed with with 5.5b; (refer to 3.6 
Business Lite - Backoffice connection overview)

5.5A BUSINESS LITE VIEW COMMUNICATION 

CONNECTION (DAISY CHAIN CONFIGURATION)

Step 1; Feed the UTP cable(s) through the rubber 
stop(s) on the data cable inlet and then connect it to 
the left Ethernet port(s), like indicated in the ‘overview 
of connections’ section; The other end should be 
connected to the right hand side Ethernet port of the 
Business Pro;
Step 2: Feed a cable from right hand side port of the 
Business Lite (View) to the left Ethernet port of the next 
Business Lite (View); (Repeat step 2 till all Lites have 
been connected)

5.5B BUSINESS LITE COMMUNICATION 

CONNECTION (STAR CONFIGURATION)

Step 1; Business Pro (View): Feed a UTP cable(s) 
through the rubber stop(s) on the data cable inlet and 
then connect it to the right Ethernet port(s), like indicated 
in the ‘overview of connections’ section; 
Step 2: Business Pro (View): Connect the UTP cable to a 
switch (no DHCP);
Step 3; Business Lite (View): Feed a UTP cable(s) 
through the rubber stop(s) on the data cable inlet and 
then connect it to the left Ethernet port(s), like indicated 
in the ‘overview of connections’ section; 
Step 4: Business Lite (View): Connect the UTP cable to 
a switch (no DHCP);

5.6 FINISHING UP (CLOSE ENCLOSURE)

Step 1; Check and make sure that the rubber (enclosure) 
seal is properly in place on the edge (all around);
Step 2; Place the cover on the charge point;
Step 3; Hand-tighten the four M4 x 12 mm bolts 
provided around the socket so that the cover closes on 
the rubber seal but the rubber seal does not deform;
Step 4; Hand-tighten the other two M4 x 12 mm bolts 
provided in the bottom of the cover;
Step 5; Turn the socket lid clockwise in the cover and 
hand-tighten the M4 x 20 mm bolt provided;
Step 6; Switch on power to the charge point;
Step 7; Wait until charge point is fully started up (+/-10 
minutes, LED should be off);
Step 8; Check that the business Pro (View) is connected 
to the network. A quick check can be done online via  

http://chargeportal.newmotion.com/test

. Simply 

enter the serial number into the search field and click 
“Search”. “Online” should appear after the serial number. 
If ‘Online’ does not appear”, check whether the charge 
point is properly connected and try again. For persistent 
issues, please contact NewMotion. 
Step 9; Check if the Business Lites are  
connected online. Check all Business Lites on  

http://chargeportal.newmotion.com/test

. “Online” 

should appear after entering the serial number. If ‘Online’ 
does not appear”, check whether the charge point is 
properly connected and reset the Business Lites while the 
Business Pro stays powered on. For persistent issues, 
please contact NewMotion. 
Step 10; If configuration of charge point power settings 
is needed (for example lower Amp settings) please 
contact NewMotion;

5. INSTALLATION PROCEDURE

Содержание NewMotion Business Lite View

Страница 1: ...INSTRUCTION MANUAL EN INSTALLATIONSANLEITUNG DE INSTALLATION MANUAL Business Pro View Business Lite View 3 7 22 kW VERSION 085NM19INT01...

Страница 2: ......

Страница 3: ...Table of contents Inhaltsverzeichnis DE 49 0 30 215 028 48 Instruction manual EN Pages 4 20 Installationsanleitung DE Pagina 21 37 NewMotion Business Lite Pro View 3 7 22 kW...

Страница 4: ...ty guidelines are intended to ensure correct installation and usage Any failure to comply with the valid safety guidelines or instructions provided in this manual may result in fire electrocution or s...

Страница 5: ...eady for use the owner needs to activate the charge point through our online portal at my newmotion com The serial number of the charge point is needed for this process which can be found on the right...

Страница 6: ...Torx screwdrivers T20 and T45 Voltage tester Tape measure Spirit level All mentioned for standard mounting plus Pole sold separately 4 x M8 wedge bolts or chemical anchors plus nuts and washers All me...

Страница 7: ...ndard colours IEC 62262 IK code robustness IEC 60529 IP code protection class EN 50470 M class EN 50470 E class Certificates kWh measurement 09 5_ _ _ _ _ 08 5_ _ _ _ _ 1 Business 2 0 and Business 2 1...

Страница 8: ...Class I 3 2 TECHNICAL SPECIFICATIONS 3 PRODUCT OVERVIEW User interface Identification Communication backoffice Pro View Communication backoffice Lite View Backoffice protocol Stand by consumption Oper...

Страница 9: ...INSTALLATIEHANDLEIDING P9 VERSION 0129NM02INT01 INSTRUCTION MANUAL P9 P9 085NM19INT01 EN DE 3 3 OVERVIEW OF PRODUCT 3 PRODUCT OVERVIEW...

Страница 10: ...P data port for Ethernet Mobile router connection Business Lite RJ45 UTP data port for connection switch star configuration or daisy chain incoming UTP data cable inlet with rubber seal Inlet for powe...

Страница 11: ...ent detection module Business Pro RJ45 UTP data port for Ethernet Mobile router connection Business Lite RJ45 UTP data port for connection switch star configuration or daisy chain incoming Business Pr...

Страница 12: ...s 3 6 BUSINESS LITE VIEW BACKOFFICE CONNECTION The Business Pro View will handle all communication with the backoffice for the Business Lites This means that a Business Lite View without being connect...

Страница 13: ...or the specific situation and according to regulations The electrician is always responsible for selecting a cable thickness appropriate for the specific situation and according to regulations 3 phase...

Страница 14: ...ottom two attachment points Ensure that the grey spacers are placed on the back of the charge point at the bottom two attachment points 5 2B MECHANICAL MOUNT POLE ON PAVEMENT Step 1 Drill holes into t...

Страница 15: ...ctions section Step 2 Business Pro View Connect the UTP cable to a switch no DHCP Step 3 Business Lite View Feed a UTP cable s through the rubber stop s on the data cable inlet and then connect it to...

Страница 16: ...minutes Step 2 Check start screen and connection the display should show the initial start screen as shown below Step 3 The date and time need to show up as grey text If it shows red text the SMED is...

Страница 17: ...re when this is not correctly configured Dynamic Power Sharing will not work correctly and could result in overloading the grid connection Installation should be carried out and charge points should b...

Страница 18: ...G P18 VERSION 0129NM02INT01 INSTRUCTION MANUAL P18 P18 085NM19INT01 EN DE 6 OPTIONAL DYNAMIC POWER SHARING L1 L2 L3 L3 L1 L2 L2 L3 L1 INSIDE Brown Black Grey Blue INSIDE Grey Brown Black Blue INSIDE B...

Страница 19: ...m Position 1 2 3 4 5 6 7 8 9 10 11 12 Serial number 09 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _...

Страница 20: ...ur car to the charge point by plugging in the charge cable If you are using Plug Charge the session will start automatically If you have to identify first swipe your charge card above the LED First th...

Страница 21: ...zung gew hrleisten Die Nichteinhaltung der Richtlinien und Anweisungen in diesem Handbuch kann zum Brand Stromschlag oder zu schweren Verletzungen f hren Die Ladestation ist ein Produkt der Schutzklas...

Страница 22: ...ereiten muss der Eigent mer die Ladestation ber unser Online Portal my newmotion com aktivieren Die Seriennummer der Ladestation wird in diesem Prozess ben tigt und kann auf der rechten Seite der Lade...

Страница 23: ...T45 Spannungspr fer Messband Wasserwaage Alle f r die Standardmontage erw hnten Elemente plus Mast separat erh ltlich 4 M8 Keilbolzen plus Muttern und Unterlegscheiben Alle f r die Mastbefestigung er...

Страница 24: ...rben IEC 62262 IK Code Robustheit IEC 60529 IP Code Schutzklasse EN 50470 M klasse EN 50470 E klasse Zertifikate kWh Messung 09 5 _ _ _ _ _ 08 5 _ _ _ _ _ 1 Business 2 0 und Business 2 1 Aufladepunkte...

Страница 25: ...lmast mit Schutzleiteranschluss Klasse I 3 2 TECHNISCHE DATEN 3 PRODUKT BERSICHT LED LCD Bildschirm N herungssensor Set RFID NFC Mifare 13 56 MHz IEC 14443A IEC 14443B Plug Charge ber Online Portal GP...

Страница 26: ...INSTALLATIEHANDLEIDING P26 VERSION 0129NM02INT01 INSTALLATIONSANLEITUNG P26 P26 085NM19INT01 EN DE 3 3 BERSICHT BER DAS PRODUKT 3 PRODUKT BERSICHT...

Страница 27: ...ANSCHL SSE INSIDE Business Pro UTP Datenport f r Ethernet Mobilrouter Verbindung Business Lite UTP Datenport f r Verbindungsschalter Sternkonfiguration oder eingehende Verkettung Klemmblock SMED mit...

Страница 28: ...der eingehende Verkettung Business Pro UTP Datenport f r Verbindungsschalter bei Sternkonfiguration oder Business Lites bei Verkettungskonfiguration Business Lite UTP Datenport f r die ausgehende Verk...

Страница 29: ...alst rke f r Vodafone Partner 80 dBm oder besser ist 3 6 BUSINESS LITE VIEW BACKOFFICE VERBINDUNG Business Pro View bernimmt alle Kommunikationen mit dem Backoffice f r Business Lites Dies bedeutet da...

Страница 30: ...erheitskomponenten verantwortlich Der Elektriker ist f r die Auswahl einer f r die spezifische Situation und die gesetzlichen Bestimmungen geeigneten Kabeldicke verantwortlich Die 3 phasige Ladestatio...

Страница 31: ...dass die grauen Abstandshalter an der R ckseite der Ladestation an den zwei unteren Befestigungspunkten platziert sind 5 2B MECHANISCHE MONTAGE MAST AUF GEHSTEIG Schritt 1 Bohren Sie f r die Keilbolz...

Страница 32: ...TP Kabel durch den Gummianschlag zum Datenkabeleinlass und verbinden Sie es dann wie im Abschnitt bersicht Anschl sse angegeben mit dem linken Ethernet Port Schritt 4 Business Lite Verbinden Sie das U...

Страница 33: ...r fen Sie den Startbildschirm und die Verbindung Auf dem Display sollte der Startbildschirm angezeigt werden siehe unten Schritt 3 Datum und Uhrzeit m ssen als grauer Text angezeigt werden Wenn roter...

Страница 34: ...orrekt konfiguriert funktioniert der dynamische Lastenausgleich nicht korrekt was zu einer berlastung der Netzanbindung f hren kann Die Installation und der Anschluss der Ladestationen muss gem der In...

Страница 35: ...ERSION 0129NM02INT01 INSTALLATIONSANLEITUNG P35 P35 085NM19INT01 EN DE 6 OPTIONAL DYNAMISCHE LASTVERTEILUNG L1 L2 L3 L3 L1 L2 L2 L3 L1 INSIDE Braun Schwarz Grau Blau INSIDE Grau Braun Schwarz Blau INS...

Страница 36: ...nsformular Position 1 2 3 4 5 6 7 8 9 10 11 12 Seriennummer 09 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _ _ _ _ _ _ 08 _...

Страница 37: ...adestation verbinden Wenn Sie Plug Charge verwenden wird die Sitzung automatisch gestartet Wenn Sie sich zuerst identifizieren m ssen streichen Sie Ihre Ladekarte ber die LED Die LED blinkt gr n um di...

Страница 38: ......

Отзывы: