Main Carriage Channel
1
.
With road lock pin (B8) installed in lower
hole of drive ram (A1), use a suitable
overhead lifting device to raise (stand up)
main carriage channel (B1).
(A1) Drive Ram. (B1) Main Carriage Channel.
(B8) Road Lock Pin.
The main carriage channel
assembly is tall and heavy. To
avoid tip over, resulting in serious
injury or death, leave the overhead
lifting device attached to the main carriage
channel while assembling components.
2
.
Remove 6 factory installed bolts (D3) and
6 lock washers (D4). Install short channel
bracket (D2) using the bolts and lock
washers. Tighten bolts completely.
(A1) Drive Ram. (D2) Short Channel Bracket. (D3) Bolt.
(D4) Lock Washer.
3
.
Remove road lock pin (B8) from lower hole
in drive ram (A1). Use the overhead lifting
device to help raise main carriage channel
(B1) and insert road lock pin (B8) in upper
hole (tool storage position) in drive ram
(A1). Install Lynch pin (B9), not shown, to
secure the road lock pin.
(A1) Drive Ram. (B1) Main Carriage Channel.
(B8) Road Lock Pin.
WARNING
9
Содержание HD-12-H
Страница 44: ...44 Service Parts 44 Driver Assembly ...
Страница 46: ...46 Hydraulic Base Plate Assembly ...
Страница 55: ...Notes 55 ...
Страница 56: ...January 2010 SHAVER HD 12 H Post Driver ...