-60
Lamp
unit
BQC-+1
Removing and Install-
ing the Lamp Unit
Caution
• Be sure to remove the lamp unit by the handle.
Do not touch the glass surface of the lamp
unit or the inside of the projector.
• To avoid injury to yourself and damage to the
lamp, carefully follow the steps below.
• Replace the lamp after turning off the power
and unplugging the power cord.
1
Put the projector into the
standby mode.
•
Press
.
•
Wait until the cooling fan stops.
2
Unplug the power cord.
•
Unplug the power cord from the AC
socket.
•
Leave the lamp until it has fully cooled
down (about 1 hour).
3
Remove the Swivel Stand. (See
page 24.)
4
Remove the lamp unit cover.
•
Loosen the user service screw that se-
cures the lamp unit cover.
•
Slide the lamp unit cover in the direc-
tion of the arrow.
5
Remove the lamp unit.
•
Loosen the securing screws from the
lamp unit. Hold the lamp unit by the
handle and pull it in the direction of
the arrow.
User service screw
-60
Regarding the Lamp
STANDBY button
Power cord
XV_Z200U_E_p57_66.p65
03.10.21, 4:21 PM
60
Содержание XV-Z200U
Страница 14: ...Connections and Setup Connections and Setup XV_Z200U_E_p13_28 p65 03 10 21 4 09 PM 13 ...
Страница 30: ...Basic Operation Basic Operation XV_Z200U_E_p29_43 p65 03 10 21 4 13 PM 29 ...
Страница 38: ...Adjustments and Settings Adjustments and Settings XV_Z200U_E_p29_43 p65 03 10 21 4 14 PM 37 ...
Страница 58: ...Appendix Appendix XV_Z200U_E_p57_66 p65 03 10 21 4 21 PM 57 ...