21
VL-A110U/UC
VL-AH130U
5-5-5. Phase matching
The phase of the following parts must be matched as
shown in the figure right.
(Ascertain that the marks and round holes align.)
(1) Lo relay gear
(2) Main cam
(3) Sub-cam
(4) Mode switch
Lo relay gear
Phase
alignment mark
(Round hole)
Phase alignment
mark ( Mark)
Phase alignment mark
(Round hole)
Mode switch
5-6. MECHANISM ASSEMBLING METHOD
(1) Adjust the phase of each part.
(2) Install screws and washers.
(3) Install the segment gear, T arm guide and the M-function
lever. Install the eject lever.
a
B
T arm guide
Segment gear
M-function lever
Move claw
to rear side.
Move claw to
rear side.
Item
Tightening torque
Quantity
a S Tight M1.4 x 3
70mN·m (0.7kgf·cm)
1
B ø0.8-ø3-t0.2
1
Содержание VIEWCAM VL-A110U
Страница 43: ...43 VL A110U UC VL AH130U M E M O ...
Страница 64: ...83 A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 VL A110U UC VL AH130U VCR PWB Wiring Side SIDE A ...
Страница 66: ...85 A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 VL A110U UC VL AH130U VCR PWB Wiring Side SIDE B ...
Страница 68: ...87 A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 VL A110U UC VL AH130U CAMERA PWB Wiring Side SIDE A ...
Страница 70: ...89 A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 VL A110U UC VL AH130U CAMERA PWB Wiring Side SIDE B ...
Страница 72: ...91 A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 VL A110U UC VL AH130U HEAD AMP PWB Wiring Side SIDE A ...
Страница 73: ...92 A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 VL A110U UC VL AH130U HEAD AMP PWB Wiring Side SIDE B ...