VC-A598U/H995U/H996U
-H997U/H9977U/H998U
28
Figure 4-43.
INSTALLING THE SHIFTER
Figure 4-42.
1. Make sure that the loading gear is at the point
1
as
shown below.
2. Install, paying attention to insert point
5
and release
point
3
.
3. For the phase matching at the insert point
1
, see the
point
2
as shown below.
4. Finally fix the inserts
1
and
4
.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point
2
Insert
point
1
Half round notch
Shaft
1
Round mark
Loading gear (T)
Insert
point
3
Insert
point
4
Insert
point
5
Release
point
3
Phase-matching
point
1
Shaft
1
Shaft
1
Shaft
4
Insert
point
2
Rotation
point
2
Содержание VC-A598U
Страница 6: ...VC A598U H995U H996U H997U H9977U H998U 6 1 3 LOCATION OF MAJOR COMPONENTS AND CONTROL ...
Страница 51: ...VC A598U H995U H996U H997U H9977U H998U 51 8 BLOCK DIAGRAM POWER CIRCUIT BLOCK DIAGRAM ...
Страница 52: ...VC A598U H995U H996U H997U H9977U H998U 52 SYSTEM SERVO BLOCK DIAGRAM ...
Страница 53: ...VC A598U H995U H996U H997U H9977U H998U 53 ...
Страница 54: ...VC A598U H995U H996U H997U H9977U H998U 54 SIGNAL FLOW BLOCK DIAGRAM VC A598U ...
Страница 56: ...VC A598U H995U H996U H997U H9977U H998U 56 SIGNAL FLOW BLOCK DIAGRAM VC H995U H996U H997U H9977U H998U ...
Страница 61: ...VC A598U H995U H996U H997U H9977U H998U 61 13 12 11 10 9 8 7 ...
Страница 65: ...VC A598U H995U H996U H997U H9977U H998U 65 13 12 11 10 9 8 7 ...
Страница 67: ...VC A598U H995U H996U H997U H9977U H998U 67 13 12 11 10 9 8 7 ...
Страница 69: ...VC A598U H995U H996U H997U H9977U H998U 69 13 12 11 10 9 8 7 ...
Страница 72: ...VC A598U H995U H996U H997U H9977U H998U 72 7 6 5 4 3 2 1 A B C D E F G H MAIN PWB ...
Страница 73: ...VC A598U H995U H996U H997U H9977U H998U 73 13 12 11 10 9 8 7 ...