28
VC-A422U
VC-H822U
Figure 4-43.
4-23 INSTALLING THE SHIFTER
Figure 4-42.
1. Make sure that the loading gear is at the Phase-Match-
ing point
1
as shown below.
2. Install, paying attention to insert point
5
and release
point
3
.
3. For the phase matching at the insert point
1
, see the
Phase-Matching point
2
as shown below.
4. Finally fix the inserts
1
and
4
.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point
2
Insert
point
1
Half round notch
Shaft
1
Round mark
Loading gear (T)
Insert
point
3
Insert
point
4
Insert
point
5
Release
point
3
Phase-matching
point
1
Shaft
1
Shaft
1
Shaft
4
Insert
point
2
Rotation
point
2
Содержание VC-A422U
Страница 50: ...VC A422U VC H822U VC A422U VC H822U 50 51 8 BLOCK DIAGRAM SYSTEM SERVO BLOCK DIAGRAM USMODEL SYSBLO eps ...
Страница 51: ...VC A422U VC H822U VC A422U VC H822U 52 53 SIGNAL FLOW BLOCK DIAGRAM VC A422U ...
Страница 52: ...VC A422U VC H822U VC A422U VC H822U 54 55 SIGNAL FLOW BLOCK DIAGRAM VC H822U ...
Страница 53: ...56 VC A422U VC H822U POWER CIRCUIT BLOCK DIAGRAM ...
Страница 61: ...69 VC A422U VC H822U A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 PWB FOIL PATTERN OPERATION PWB LCD PWB ...
Страница 63: ...72 VC A422U VC H822U M E M O ...
Страница 76: ...85 VC A422U VC H822U M E M O ...