background image

4

E

For any other assistance or information about this kit,  

in USA please call Sharp’s Customer Assistance Center at 

1-800-BE-SHARP (1-800-237-4277)

In Canada, call 905-568-7140

SHARP ELECTRONICS CORPORATION
1 Sharp Plaza Suite 1, Mahwah, New Jersey 07495-1123, U.S.A.
SHARP ELECTRONICS OF CANADA LTD.
335 Britannia Road East Mississauga, Ontario L4Z 1W9, Canada

C. CABINET  INSTALLATION:  Avoid  pinching  the  cord 

between the oven and the wall. Adjust the position of the 
oven so that the feet of the oven are fitted into the holes 
of the Bottom Duct Assembly. See Figure 8.

DUCT RECESS

BOTTOM 

DUCT 

ASSEMBLY

FOOT

Figure 8

D. BACK FRAME INSTALLATION: Position back frame equal 

space top to bottom, side to side. Mark for 4 holes, center 
punch and pre-drill with 1/16" drill bit. Secure frame with 4 
SCREWS (G). See Figure 9.

EQUAL GAP TOP, BOTTOM

EQUAL GAP

SIDE TO SIDE

MOUNTING HOLES

MOUNTING HOLES

MOUNTING HOLES

MOUNTING HOLES

Figure 9

E. FRONT FRAME INSTALLATION: Place the FRONT FRAME 

onto the BACK FRAME and align ball studs and receivers. 
Secure the FRONT FRAME to the BACK FRAME by firmly 
pushing the front frame onto the back frame engaging the 
four (4) snap attachments. See Figure 10.

SNAP

ATTACHMENT

Figure 10

Содержание RK-94S27

Страница 1: ...sel turntable from the oven cavity Because the kit includes metal parts due caution should be used in handling and installation to avoid the possibility of injury INSTALLATION INSTRUCTIONS ITEM PART NAME QTY A DUCT A 1 PDUC 0259WRW0 1 B DUCT A 2 PDUC B127MRP0 1 C DUCT A 3 PDUC A734WRW0 1 D DUCT B PDUC 0260WRW0 1 E DUCT C PDUC A274WRW0 1 F BOTTOM DUCT ASSEMBLY FDUC B099MRK1A 1 G M3 9 16MM PAN HEAD ...

Страница 2: ...edge of DUCT B into the hold lip of DUCT C Secure together by using a SCREW I provided in the kit See Figure 2 DUCT C DUCT B SCREW I Figure 2 B Position DUCT A 1 on the top of the oven inserting edge of DUCT BC assembly into hole lip of DUCT A 1 Tighten two SCREWS I securing DUCT A 1 to DUCT BC assembly See Figure 3 SCREW I DUCT A 1 DUCT BC SCREW I Figure 3 Outlet should NOT be in the shaded area ...

Страница 3: ... Figure 5B SCREW SCREW Figure 5B A BOTTOM DUCT ASSEMBLY Place the Bottom duct in the center of the opening so that gap A is equal to gap B When the Bottom Duct assembly is positioned properly the front edge of the duct will be flush with the front of the cabinet Secure with 2 SCREWS H See Figure 6 GAP A NOTE CENTER BOTTOM DUCT ASSEMBLY IN THE OPENING DETAIL A GAP B BOTTOM DUCT ASSEMBLY SCREW H Fig...

Страница 4: ...re fitted into the holes of the Bottom Duct Assembly See Figure 8 DUCT RECESS BOTTOM DUCT ASSEMBLY FOOT Figure 8 D BACK FRAME INSTALLATION Position back frame equal space top to bottom side to side Mark for 4 holes center punch and pre drill with 1 16 drill bit Secure frame with 4 SCREWS G See Figure 9 EQUAL GAP TOP BOTTOM EQUAL GAP SIDE TO SIDE MOUNTING HOLES MOUNTING HOLES MOUNTING HOLES MOUNTIN...

Отзывы: