38
11. Notice:
1. Machine Operation:
a.
Machine must be installed on a solid base.
b.
Be sure the machine base and surface have proper contact before
tightening anchor bolts.
c.
Be sure motor voltage conforms to the source voltage and properly
grounded.
d.
Turn off machine before changing gears.
e.
Be sure cutter or tool is clear of the workpiece before starting or
stopping the machine.
2. Machine Operator:
a.
Only authorized personnel should operate mill.
b.
If a problem is suspected, stop mill immediately, check for the problem,
and make any repair or adjustment that maybe required.
c.
Auto feed lever must be in neutral before starting mill.
d.
Stop machine when inspecting tool or workpiece.
e.
Be certain that workpiece is properly clamped prior machining.
f.
Spindle must be kept clean and lubricated at all times.
g.
Keep tools and other objects off of table to eliminate damage or nicks.
h. Make sure spindle is up to speed before starting the machining operation.
i.
Use a brush to remove chips.
Содержание LMV Series
Страница 8: ...4 DVS HEAD Emergency Stop Forward Reverse Switch Brake Speed Meter Speed Knob ...
Страница 22: ...18 ...
Страница 24: ...20 ...
Страница 30: ...26 Figure 25 ...
Страница 32: ...28 Figure 26 ...
Страница 43: ...39 PARTS LIST ...
Страница 45: ...41 DVS HEAD PARTS 1 ...
Страница 47: ...43 DVS HEAD PARTS 2 ...
Страница 49: ...45 ...
Страница 50: ...46 ...
Страница 55: ...51 ...
Страница 59: ...55 ...
Страница 62: ...58 ...
Страница 64: ...60 ...
Страница 66: ...62 ...
Страница 68: ...64 ...
Страница 70: ...66 ...
Страница 72: ...68 ...
Страница 74: ...70 ...
Страница 76: ...72 ...
Страница 78: ...74 ...
Страница 81: ...77 ...
Страница 84: ...80 ...