4-1
L0170DC
CABINET DISASSEMBLY INSTRUCTIONS
NOTE: CBA AND PWB MEANS PRINTED WIRING
BOARD.
1. Disassembly Flowchart
This flowchart indicates the disassembly steps to gain
access to item(s) to be serviced. When reassembling,
follow the steps in reverse order. Bend, route, and dress
the cables as they were originally.
1
: Identification (location) No. of parts in the figures
2
: Name of the part
3
: Figure Number for reference
4
: Identification of parts to be removed, unhooked,
unlocked, released, unplugged, unclamped, or de-
soldered.
P=Spring, L=Locking Tab, S=Screw,
CN=Connector,
*=Unhook, Unlock, Release, Unplug, or Desolder
e.g. 5(S-1) = five Screws (S-1),
2(L-2) = two Locking Tabs (L-2)
5
: Refer to "Reference Notes."
2. Disassembly Method
↑
↑
↑
↑
↑
1
2
3
4
5
[1] Rear Cabinet
[2] Main CBA
[3] LCD Main CBA
[5] Function CBA
[4] Liquid Crystal Panel
[6] Speaker L
[8] Front Cabinet
[7] Speaker R
No.
LOC.
ID/
PART
REMOVAL
No.
Fig.
UNPLUG/DESOLDER
UNLOCK/RELEASE/
REMOVE/*UNHOOK/
Note
[1]
Cabinet
Rear
D1 7(S-1), (S-2)
-
[2]
Main CBA
D3
D2
*CN404, *CN104
*CN402, *CN403,
*CN802, *CN401,
*CN103A, *CN801,
*CN101A, *CN102A,
3(S-3), 3(S-4), 2(S-5),
-
[3]
CBA
LCD Main
D3
D2
*CN311A, *CN321A
4(S-6), *CN310A,
-
[4]
Panel
Crystal
Liquid
D3
D2
4(S-7)
-
[5]
CBA
Function
D3
D2
3(S-8)
-
[6]
Speaker L
D3
D2
2(S-9)
-
[7]
Speaker R
D3
D2
2(S-10)
-
[8]
Cabinet
Front
D2 ----------
-