FO-71RA
FO-51RA
Screw
Screw
Paper support guide
FAX machine
Control PWB
unit
CNPRG
Main Cable
QCNW-306BSCZZ
From Program
Loader BOX (CN1)
8 – 5
Fig. 2. Program loader BOX
FRONT PANEL
BACK PANEL
AC
CORD
FUSE
MAIN SW
IC
Voltage
ON
OFF
5V
3.3V
PARK SW
ON
OFF
RS-232C
DSUB 9PN
BAT SW
ON
OFF
CALIBRATION
ON
OFF
MODE
CALIBRATION
Cordless
DOWNLOAD
CN1
CN2
MAIN
CALIBRATION
DOWNLOAD
Table 2. Program loader BOX connection procedures
FAX PWB rewriting
1
Before connecting the PC
and Program loader BOX
with RS-232C cable.
Set the switches of Program
loader BOX as follows.
(a) MAIN SW OFF (down)
(b) CALIBRATION OFF
(down)
(c) BATSW OFF (down)
(d) PARK SW OFF (down)
(e) IC Voltage to 3.3V (down)
(f) MODE to DOWNLOAD
(down)
2
After connecting the PC
and Program loader BOX
with RS-232C cable. (1*)
Set the switch of Program
loader BOX as follows.
(g) MAIN SW ON (up)
3
Power supply to the FAX
machine.
Plug the power cable of the
FAX machine to the outlet.
(2*)
4
Connect Program loader
BOX and the Control PWB
of the FAX machine
(CNPRG) with Main cable.
(3*)
---
1*: Connect one end of RS-232C cable to the COM port of the PC and the other end to RS-232C DSUB 9PIN of
Program loader BOX.
2*: Press and hold down the keys 1 and 3 simultaneously while turning on the FAX machine and until “DOWNLOAD
MODE” appears.
3*: Perform the procedure
3
before
4
. (Turn on the Program loader BOX and the FAX machine before connecting
Main cable and the FAX machine.)
Connect one end of Main cable to the connector of the Control PWB connector for the FAX machine (CNPRG) (refer
to Fig. 3), and the other end to CN1 of Program loader BOX.
Fig. 3. Connection of Main cable
Содержание FO-51
Страница 64: ...FO 71RA FO 51RA Control PWB parts layout Top side 6 7 ...
Страница 65: ...FO 71RA FO 51RA Control PWB parts layout Bottom side 6 8 ...
Страница 69: ...FO 71RA FO 51RA TEL LIU PWB parts layout Top side 6 12 ...
Страница 70: ...FO 71RA FO 51RA 6 13 TEL LIU PWB parts layout Bottom side ...