17-1
17-2
ADJUSTMENT
ITEM
ADJUSTMENT
POSITION
CONTROL
PRE-ADJUST
REQUIREMENT
CONTENT
INPUT
CONDITION
OUTPUT
ADJUSTMENT
PROCEDURE
HISTORY
OF REVISION
V-PHASE
V06
STEP RANGE
0-7
I
2
C CONTROL
OPTION SET UP, BUS SET UP, CRT-PURITY
US 6 CH LION HEAD (MONOSCOPE PATTERN)
230V, RF INPUT, ZERO MAGNETIC FIELD
CONFIRMATION ON CRT SCREEN
ADJUST V06 BUS DATA TO HAVE MOST ACCEPTABLE VERTICAL PO-
SITION.
THE MONOSCOPE PATTERN SHOULD BE BALANCE IN VERTICAL
POSITION
NOTE: THE DATA FOR V06 LIMIT AT <= 04, EVEN POSITION GOOD
ENOUGH
[CHECKING CONFIRMATION]
SYMBOL
REVISED CONTENT,
ADJUSTMENT
ITEM
ADJUSTMENT
POSITION
CONTROL
PRE-ADJUST
REQUIREMENT
CONTENT
INPUT
CONDITION
OUTPUT
ADJUSTMENT
PROCEDURE
HISTORY
OF REVISION
1) BY SELECTING THE V18, BOX BLK TEXT WILL BE APPEARED.
2) ADJUST THE V18 BUS DATA TO HAVE A BALANCE POSITION TO
SPEC OF A=B.
CLOSED CAPTION SET UP
V18
STEP RANGE
0~255
I
2
C CONTROL
OPTION SET UP, BUS SET UP
US 6 CH LION HEAD
AC 230V
CONFIRMATION ON CRT DISPLAY.
[CHECKING SPEC]
LEFT AND RIGHT SYMMETRICAL
SYMBOL
REVISED CONTENT,
A
B
TEXT BOX BLK
21
V-F
R
9
5S
Содержание 21V-FR95S
Страница 25: ...25 WAVEFORMS 21V FR95S ...
Страница 26: ...26 6 5 4 3 2 1 A B C D E F G H CHASSIS LAYOUT 21V FR95S DUNTKD373WE PR701 ...
Страница 27: ...27 6 5 4 3 2 1 A B C D E F G H CRT BLOCK DIA GRAM 21V FR95S ...
Страница 28: ...28 A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 MAIN BLOCK DIAGRAM AV OUT Q803 BUFFER 21V FR95S ...
Страница 29: ...29 21V FR95S 10 11 12 13 14 15 16 17 18 19 ...
Страница 30: ...30 A B C D E F G H I J 1 2 3 4 5 6 7 8 9 10 MTS BLOCK DIAGRAM 21V FR95S ...
Страница 32: ...21V FR95S ...
Страница 33: ...34 6 5 4 3 2 1 A B C D E F G H SCHEMATIC DIAGRAM CRT Unit 21V FR95S ...
Страница 34: ...35 6 5 4 3 2 1 A B C D E F G H 21V FR95S SCHEMATIC DIAGRAM MTS Unit ...
Страница 37: ...38 6 5 4 3 2 1 A B C D E F G H 21V FR95S PWB B CRT Unit Wiring Side ...
Страница 47: ...I NAKAMURA M GABIT A UGALDE A CALING 1 Noted Approved Checked Prepared Issue No Date Received by ...