
8
Air Disinfection & Purification Machine (FAST-Y-90A)
Figure-4
Operation
Power-on
Insert the power plug (three-phase ground) of the purifier into an external in-
dependent socket (it should be reliably grounded).After the power is switched
on, the 4-1
red power indicator on the purifier lights up, indicating that the
power has been switched on.
Startup / Shutdown
Startup: After the 4-1
red power indicator lights up, press the 4-4
switch
button, the 4-2
green running indicator on the purifier will light up, the
touch screen will start up, and the screen will light up, indicating the purifier
has entered standby mode.