7
o
f
9
Step 2:
Insert the “Push Button” end of the “Short” Roof Support (C) into the Center Roof Connector (A) and
attach to the “U” Bracket (K) on top of the Assembled Cross-Beams (E1 and E2) using Bolt, Washers,
and Nut (M). See Figure 8.
Note:
Roof Assembly requires a Step Ladder and help from a third person.
Step 3:
Insert the “Push Button” end of the “Medium” Roof Support (D) into the Center Roof Connector (A)
and attach to Long Cross-Beams (F) using Bolt, Washers, and Nut (M). See Figure 9.
Figure 8 Figure 9
IV. Canopy/Valance Assembly:
Step 1:
Place the Main Canopy (Q) over the Roof. Leave the Main Canopy loose until Roof Vent Canopy has
been installed.
Note:
Roof Vent Frame must remain exposed. Roof Vent Frame is welded to the top
of Roof Supports (B).
Step 2:
Place Roof Vent Canopy (P) over Roof Vent Frame and secure to the ends of the Roof Vent Frame. See
Figure 11.
Step 3:
Firmly secure the Main Canopy (Q) to the ends of the Main Roof Support Frame (B, C, and D). See
Figure 10.
Step 4:
Insert the Valance between the Round Steel Rail and the Cross-beam.
Figure 10 Figure 11