
9
05. Installation
-How to use assemble pipe lines
1) Please check if all parts are in the package;
-1 panel of 1 Flow meter and valve,
-3 pipe lines with nuts,
-1 Gas gauge with valve
Fig-3) In case of Pipe parts for 2 gas channels; 1 panel of 2 Flow-meters and valves, 4 pipe
lines with nuts, 1 Gas gauge with valve.
Fig-3)
Fig-2)
Содержание SH-FU-100TH-WG
Страница 1: ...1 SH FU 50 80 100 120TH WG 1500 C TUBE FURNACE Gas Flow Package Version 2020 Rev 0...
Страница 5: ...5 50 80 100 120TH 03 The Outward...
Страница 7: ...7 05 Installation...
Страница 11: ...11 06 Setting and Operation 1 Controller...
Страница 12: ...12 06 Setting and Operation...
Страница 13: ...13 06 Setting and Operation...
Страница 14: ...14 06 Setting and Operation...
Страница 15: ...15 06 Setting and Operation...
Страница 16: ...16 07 Specifications 1500 Tube Furnace Gas Flow Package 50 80 100 120TH WG...
Страница 17: ...Memo...
Страница 18: ...Memo...
Страница 19: ...Memo...
Страница 20: ......