background image

Changing setting

press        

for 1 sec

11

After setting

press SET for 1 sec

1.LC means program No,

LC means parameter when operating is end.

RST-Stop operating after last segment

HOLD-Keep temp of last segment

PTH1-Endless loop of No.1 program

PTH2-Endless loop of No.2 program

5)

6)

7)

8)

Setting "0" is no effect for operating.

After setting

press SET for 1 sec

Changing setting

press        

for 1 sec

Changing setting

press        

for 1 sec

After setting

press SET for 1 sec

SP1 is setting parameter for 

1st testing temp.

ex) 1st testing temp is 100℃

※ Heating time is depending on heating value

If you setting time more shorten the overshoot 

will be increased.

Time1 is setting parameter for heating time.

After setting

press SET for 1 sec

Changing setting

press        

for 1 sec

ex) Set heating from 30℃ to 100℃

for 10min.

Содержание SH-FU-1.5MGV

Страница 1: ...Version 2021Rev 0 1200 C Muffle Furnace with Vacuum SH FU 1 5MGV 10MGV 31MGV 1500 C Muffle Furnace with Vacuum SH FU 4 5MHV 18 7MHV...

Страница 2: ...m Setting and Operation 6 Temperature Setting and Operation 7 Specification 3 4 5 7 9 10 18 Keep this manual on hand so it can be used by all operators of the unit Use the unit only in the way describ...

Страница 3: ...stand behind our products and want to let you know we are here if you need us Before you use the unit read this entire manual carefully to understand how to install operate and maintain the unit in a...

Страница 4: ...OHIBITED with regards to the unit Important operating and or maintenance instruction Read the accompanying text carefully Potential electrical hazards Explosive No disassemble Flammable Hot surface or...

Страница 5: ...5 3 The outward SH FU 1 5MGV 10MGV 31MGV Vent port Heater S W Temp Controller Pressure gauge Vacuum Vent valve Gas valve Gas out port Gas in port Vacuum port Concent Main S W...

Страница 6: ...6 Vent port Heater S W Temp Controller Pressure gauge Vacuum Vent valve Gas valve Gas out port Gas in port Vacuum port Concent Main S W SH FU 4 5MHV 18 7MHV...

Страница 7: ...e the product is delivered place the package on a flat location Unscrew the bottom of the box Place the equipment on your desired location Unwrap the bag Lift the box as shown in the picture Lift the...

Страница 8: ...r to the floor by turning the level controller clockwise or counterclockwise Unlock position When moving equipment Lock position When stopping moving equipment or installing Counter clockwise Clockwis...

Страница 9: ...s valve Operate Vacuum Pump Vacuum gauge begins to fall When the vacuum gauge is completely fallen as shown in the below figure place the Vacuum Vent valve in the center Turn off Vacuum Pump Open the...

Страница 10: ...setting mode ex 100 for 1 hour 200 for 1 hour 1 2 3 4 Press SET for 1 sec Goes to pattern mode Press SET for 1 sec Press PT1 for 1 sec 1 time Press PT2 for 1 sec 2 time Goes to program pattern settin...

Страница 11: ...no effect for operating After setting press SET for 1 sec Changing setting press for 1 sec Changing setting press for 1 sec After setting press SET for 1 sec SP1 is setting parameter for 1st testing...

Страница 12: ...ec TS1 Time Signal is setting for usage of function Only use in case of using controller EV TS2 is setting for usage of function Only use in case of using controller EV After setting press SET for 1 s...

Страница 13: ...ress SET for 1 sec Changing setting press for 1 sec Changing setting press for 1 sec SP4 is setting parameter for keep section of 1st testing Temp After setting press SET for 1 sec Changing setting pr...

Страница 14: ...SET for 1 sec Changing setting press for 1 sec Changing setting press for 1 sec After setting press SET for 1 sec TS4 is setting parameter for usage of function Only use in case of using controller EV...

Страница 15: ...set as 1 After setting press SET for 1 sec REN is setting setting last segment No of repeat mode But you don t need to use repeat function So please set as 0 After setting press SET for 3 sec RST is...

Страница 16: ...ing SET 1 sec Press SET for 1 sec to check present operating showing on SP On going process of segment1 Program 1 lamp lighting Present Temp PV Program 1 lamp lighting Check heater PV ex 2 heating PV...

Страница 17: ...perating showing on SP Check operating SET 1 sec Check operating SET 1 sec Out lamp is light is on and off during operating and heating EV1 EV2 EV3 Assistant AT Auto Tuning HOLD Temp hold Program 1 la...

Страница 18: ...30mm 730x690x930mm 20 87x19 29x28 74 24 80x23 23x32 68 28 74x27 17x36 61 Material External Steel Plate with powder heating coated Heater Element KANTHAL A 1 Ceramic heating Insulation Ceramic Board Wo...

Страница 19: ...50mm 250x300x250mm 5 91x7 87x5 91 9 84x11 81x9 84 Dimension External W D H 630x590x830mm 730x690x930mm 24 80x23 23x32 68 28 74x27 17x36 61 Material External Steel Plate with powder heating coated Heat...

Страница 20: ......

Отзывы: