SGS TJH10 Скачать руководство пользователя страница 11

PAGE 11

TECHNICAL COMPONENTS (EXPLODED VIEW)

Содержание TJH10

Страница 1: ...FOR YOUR SAFETY PLEASE READ THESE INSTRUCTIONS CAREFULLY AND RETAIN THEM FOR FUTURE USE OWNER S MANUAL TJH10 PROFESSIONAL TROLLEY JACK...

Страница 2: ...its capacity 10 tons 10000kg Ensure the vehicle handbrake is engaged and in first gear or park for automatic vehicles before lifting it with this product It is also advised to use wheel chocks when l...

Страница 3: ...ween static objects such as doors walls etc to allow for vehicle tilting Never adjust the safety overload valve Never top up the hydraulic system of this trolley jack using brake fluid Always lift in...

Страница 4: ...g fluid anywhere on the trolley jack bent parts missing parts loose parts damaged parts This trolley jack should be taken out of service if it is believed to have been subjected to an abnormal load or...

Страница 5: ...llowing these steps 1 Fully opening the release valve turn the handle knob counter clockwise 2 Then while holding the saddle down pump the pedal rapidly several times 3 Close the release valve turn th...

Страница 6: ...ended by the vehicle manufacturer Do not work under the vehicle without the use of jack stands Jacks are not designed to maintain heavy loads for long periods of time 7 Do not attempt to place jack st...

Страница 7: ...Add lubrication to all moving parts as needed Every 6 months Carry out a thorough inspection for service ability of component parts Visually inspect for oil leaks only a slight oil seepage is permiss...

Страница 8: ...aminated pump valves not sealing cylinder ram may be binding Contact customer service 44 01332 576 850 Lift arm will not lower Cylinder ram binding parts may be worn and or internal dam age or a broke...

Страница 9: ...nservicable drain off all fluid and dispose of in a proper manner paying heed to any environmental preservation regulations WARRANTY This SGS product is covered by a 24 month warranty from the initial...

Страница 10: ...ER 1 2 7 O RING 1 2 8 O RING RETAINER 1 2 9 SNAP RING 1 2 10 OIL CYLINDER ASSY 1 2 11 OIL FILLER PLUG 1 2 12 PIN 2 2 13 STEEL BALL 6 DIA 1 2 14 STEEL BALL 9 DIA 1 2 15 SPRING 1 2 16 COPPER WASHER 1 2...

Страница 11: ...PAGE 11 TECHNICAL COMPONENTS EXPLODED VIEW...

Страница 12: ...opean Communities Directive s and Standard s PLACE DATE Signature Robert Wyatt Company Secretary Derby UK 24th JUNE 2017 SGS Engineering UK Ltd SGS Engineering UK Ltd West Side Park Raynesway Derby DE...

Отзывы: