
PRESSURE LEAK DETECTOR DLR-P ..
- 31 -
(8) After the operating pressure of the leak detector has been
reached (pump in leak detector shuts off), turn three-way valve
20 180°, switch off the pump and remove it.
(9) Turn three-way valve 21 180° and remove the measuring gauge.
(10) Perform a functional check according to section 7.3.
21
20
Commissioning