
© S
FS i
nt
ec
, 2
01
8
M
A
_T
UF
_1
1-
20
18
Te
ch
ni
ca
l cha
nge
s r
es
er
ve
d
All calculations therefore have to be checked and approved by the responsible planner ahead of execution.
The user is responsible to assure compliance with all applicable laws and regulations.
SFS intec AG
Division Construction
Rosenbergsaustrasse 20
CH-9435 Heerbrugg
www.sfs.biz
3.1
Panel must lie on
a hard surface
3.2
Keep a right angle
during the setting
process
Push the GESIPA
®
PowerBird
®
Pro
slightly towards
the panel
2.2
There is a gap
between the
TU-fastener head and
the bracket
2.3
Giving heavy force
to the TU-fastener
while not removeing
the mandrel can
cause damage to
the panel
thickness
6
0
-0,1
ø
Bracket
+0,5 0
Drill depth
L
6,5
ø
-7,0
12
≥
2.2
3.1
2.3
3.2
2. Position the bracket
3. Remove mandrel
Position the pre-drilled bracket over the hole in the panel and push through the TU-fastener
Remove the mandrel using the GESIPA
®
PowerBird
®
Pro riveting tool combined with nose piece 17/36 or 17/40
Dimension must be kept