background image

1.0 GENERAL INFORMATION

Thank you for purchasing the Setra Remote Monitoring Display (SRMD). The 
SRMD is a digital panel meter with a bright 1” LED display for visibility at a 
distance.

Before installing, please check the box and ensure the following items are 
included:

 

 

1. Mounting Plate (with single or dual display in color(s) ordered:  

 

    green, red, or blue)

 

2. Faceplate Bezel (White or Metallic Finish, as ordered)

 

3. Engineering units label se

t

    

Note: If a dual display is ordered with a SRH temperature or humidity sensor and a color specified to match 
each (or your own sensors), wire the correct sensor to the correct display.

The SRMD can be powered by 24 VAC/DC and can accept 0 to 5 or 0 to 10 
VDC transducer signals from remote sensors. These field sensors can be tem-
perature, humidity, CO2, etc.

Fig. 1. 

Model SRMD

Setra Remote Monitoring Display

Mounting Plate

Grommets for
Faceplate/Bezel

Faceplate/Bezel

Engineering Unit Labels

Содержание SRMD

Страница 1: ...lue 2 Faceplate Bezel White or Metallic Finish as ordered 3 Engineering units label set Note IfadualdisplayisorderedwithaSRHtemperatureorhumiditysensorandacolorspecifiedtomatch each oryourownsensors w...

Страница 2: ...sion would be 2 wires and the dual display needs 2 wires for each of the two displays Run the wiring to the 24 VAC DC source and to the sensors that are to be monitored The power to the sensors is not...

Страница 3: ...nal strip If you are using field sensors that are not Setra s SRH humidity temperature sensors then calibrate the display according to Section 4 before completing the wiring shown here Fig 3 Wiring E...

Страница 4: ...display 0 to 100 factory default setting Calibration requires a calibrated Voltage Source to simulate the sensor analog output Set range dip switch to either 5 V for a 0 to 5 V input or 10 V for a 0 t...

Страница 5: ...tup Humidity Sensor Apply 0 V and if necessary turn the ZERO potentiometer pot until the display reads 0 0 apply 5 VDC and turn the pot labeled 5V until the display reads 100 0 Setup Temperature Senso...

Страница 6: ...he depth of the electrical box relative to the finish wall see Fig 2 install the mounting plate to the electrical box Be sure that the displays are installed right side up Install the 2 mounting screw...

Страница 7: ...pins with the rubber grommets in the mounting plate Slowly and evenly push the bezel until the back of the bezel is flush against the finish wall Choose the appropriate Engineering unit labels for th...

Страница 8: ...r normal installation use and service e SETRA is notified in advance of and the product is returned to SETRA transportation prepaid Unless otherwise specified in a manual or warranty card or agreed to...

Отзывы: