Setra Lite Construction Kit
Installation & Operating Guide
Setra Systems, Inc.
159 Swanson Road, Boxborough, MA 01719
800.257.3872 • www.setra.com
Страница 1: ...Setra Lite Construction Kit Installation Operating Guide Setra Systems Inc 159 Swanson Road Boxborough MA 01719 800 257 3872 www setra com...
Страница 2: ...ut of Standby mode by pressing the front lens 3 times in quick succession 2 0 Key Features 2 1 Case The Setra LITE Construction Kit comes in a convenient easy to carry case which is designed for the m...
Страница 3: ...low Spare tools and accessories pocket included with calibration certificate Pluggable AC power pack with interchangeable adapters for worldwide electrical outlets and 5 ft power cord Battery pack for...
Страница 4: ...de of the case via the power jack as shown in Image 2 Turn on via the Power Switch located as shown in Image 2 The power switch functions as follows Center OFF Up ON via AC Power up direction is towar...
Страница 5: ...t to the Quick Disconnect Tubing Power as shown in Image 1 Note Unit should be placed in such a manner as to reach the sensing space within 15 feet Tubing can be routed over or under isolation tarp as...
Страница 6: ...navigate to the next screen Press the LEFT button to navigate to the previous screen and eventually exit the configuration menu The unit will also automatically timeout and return to normal operation...
Страница 7: ...l across the sensor Press and hold the RIGHT button to adjust the alarm limits i e pressure at which the LED ring will turn red the screen text will flash 3 times to indicate that the setting is ready...
Страница 8: ...eady to be adjusted Use the LEFT and MIDDLE buttons to adjust between positive POS negative NEG or neutral OFF When finished press the RIGHT button to save the setting The screen text should flash 3 t...
Страница 9: ...ould flash 3 times to indicate return to the main configuration selection screens 3 5 6 Digits Press and hold the RIGHT button to select between no ring light alarm red ring light only or both green r...
Страница 10: ...etting The screen text should flash 3 times to indicate return to the main configuration selection screens Press and hold the RIGHT button to adjust the brightness of the LED light ring the screen tex...
Страница 11: ...BAS building automation system if desired Simply connect to the terminals provided on the outer side of the case as shown in Image 1 The user can select the desired analog output 4 20 mA 0 5V or 0 10...
Страница 12: ...period provided that a the product has not been subjected to abuse neglect accident incorrect wiring not our own improper installation or servicing or use in violation of instructions furnished by SE...