DA
L
19
65
Pag. 1/5
M
T
/2
A
+
C
F
/2
A
I
E
MT/2A -
03.2A
UNDERGROUND MOTOR FOR WING GATES UP TO
3
,00 m AND 250 Kg
EACH WING - 230Vac
CF/2A -
03.CF
FOUNDATION BOX
E
R
A
I
S
GATE AUTOMATION DIVISION
INSTALLATION MANUAL
!
Thank you for choosing a SERAI ELETTRONICA product, which we are confident will perform to your requirements.
Please be advised that you are about to fit a
system
classified as “a power-operated drive designed to move automatic ga-
tes and doors in commercial or residential buildings accessed by vehicles and persons”, and as such, the system must be
considered
potentially hazardous
. By law, you are responsible for rendering this equipment as “safe” as is reasonably pos-
sible.
Installation and maintenance of equipment of this kind must therefore be carried out by
skilled, qualified and trained
personnel, working in a professional manner
, as provided for by law n. 46/90 and any subsequent amendments and
supplements.
The law in question prohibits the construction of these types of systems by non-qualified personnel
.
SERAI manufacturing complies with the following legislation:
Applicable directives for the CE marking
:
Machines:
98/37/EEC
Low Voltage:
73/23/EEC
Electromagnetic Compatibility:
89/336/EEC
General applicable standards
:
Electrical Safety:
IEC EN60335-1 + IEC EN60335-2-103
Electromagnetic Compatibility - Emissions:
CEI EN61000-6-3
Electromagnetic Compatibility - Immunity:
CEI EN61000-6-
Apart from the legislation mentioned above, you are also reminded to comply with the following standards during the
installation phase.
General applicable standards
:
Safety of electrical systems in non-specialised environments:
CEI 64-8
Specific product standards applicable
:
Safety in the use of power-operated doors - requirements:
UNI EN12453
Safety in the use of power-operated doors - testing methods:
UNI EN12445
SERAI products enable users to build systems which comply with these standards. This is extremely important as
THE INSTALLER IS LIABLE FOR THE SYSTEM AND FOR ENSURING ITS OPERATION COMPLIES WITH
LEGAL PROVISIONS.
This handbook must be read in full before proceeding with the installation of the various parts of the system.
The installation of the mechanical end stops for gate opening and closure is necessary for system safety purposes
and therefore this operation must be performed before proceeding with the installation of the control unit.