![Sentiotec CK 41 Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/sentiotec/ck-41/ck-41_instructions-for-installation-and-use-manual_1244675062.webp)
Installation instructions, for professionals only
p. 18/44
6. Performing tests
The following tests must be performed by a certified electrical fitter.
WARNING!
The following tests must be performed with the power supply
switched on. There is a danger of electric shock.
●
NEVER touch live parts.
1. Check the contact of the earth conductors on the earth conductor terminal.
5.9. Connecting the operating unit
●
Guide the connection cable for the operating unit through the cable bush-
ing
9
into the low-voltage connection area
5
.
●
Connect the plug of the ribbon cable to the connection socket
2
.
5.10. Finishing the installation
●
Screw two cross-head screws into the lower fastening holes
6
(
Fig. 2
).
● Ensure that the sauna control unit is fitted securely.
●
Place the control panel
2
onto the housing lower part
7
. To do so, insert
the tabs
3
into the two lateral holders
4
and press onto the housing lower
part until the stop position (
Fig. 1
).
●
Place the housing cover
6
onto the housing lower part
7
, swivel downward
and press until it clicks audibly.