
www.sentera.eu
MIW-DTP-M-EN-000 - 25 / 11 / 2020
7 - 7
VERIFICATION OF INSTALLATION
After powering the unit, the LED on the left of the RJ45 socket (
Fig. 4 - 1
) should
light up to indicate that the unit is supplied.
The LED on the right of the RJ45 socket (
Fig. 4 - 2
) indicates that there is active
Modbus communication.
If your unit does not function as expected, please check the connections.
Fig. 4 Indications
1
2
TRANSPORT AND STORAGE
Avoid shocks and extreme conditions; stock in original packing.
WARRANTY AND RESTRICTIONS
Two years from the delivery date against defects in manufacturing. Any modifications
or alterations to the product after the date of publication relieve the manufacturer
of any responsibilities. The manufacturer bears no responsibility for any misprints or
mistakes in this data.
MAINTENANCE
In normal conditions this product is maintenance-free. If soiled, clean with a dry or
damp cloth. In case of heavy pollution, clean with a non-aggressive product. In these
circumstances the unit should be disconnected from the supply. Pay attention that
no fluids enter the unit. Only reconnect it to the supply when it is completely dry.
DTP-M
DIGITAL TEMPERATURE PIPE SENSOR