![Sennheiser SL MCR DW Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/sennheiser/sl-mcr-dw/sl-mcr-dw_manual_1242798007.webp)
SL MCR DW
8
Mounting the receiver on the ceiling
To mount the receiver on the ceiling, you will need the mounting frame sup-
plied.
Screws and anchors for mounting the product to the ceiling are not
included with delivery. Use screws and anchors that are appropri-
ate for the particular characteristics of your ceiling.
►
▷
Use the included drilling template to mark the drill holes for ceiling
mounting.
▷
Maintain a minimum distance of 1.5 m from the walls.
▷
Screw the mounting frame to the ceiling using four suitable screws and
anchors.
cent
er
line
cen
te
r
line
top
cen
ter
line
wa
ll mo
unt
VESA
100
ce
nt
er
line
>1,5 m
>1,5 m
>1.5 m
>1.5 m
>1,5 m
>1,5 m
>1,5 m
>1,5 m