Senco SHS51XP Скачать руководство пользователя страница 5

5

GB

5

4 Safety

4.1 Symbols used

Danger

Ignoring this warning can result in injury.

Warning

Ignoring this warning can result in injury or severe damage to the device.

Caution

Ignoring this warning can result in minor damage to the device.

Info

Important information.

4.2 Safety rules

• The user has read and is fully familiar with the manual!

• Only fasteners from Senco are used. These are tested by Senco for these devices.

• The Smart Bridge receives the correct maintenance (see Maintenance chapter).

• The user and the employees who work on the Smart Bridge or in the vicinity wear safety glasses and the correct 

hearing protection.

• Before a button is operated, the user must check that he can safely press this button.

• The operating pressure does not exceed 8 bar.

• The devices never tack 2 x in the same location (the tacks can ricochet off the tacks that are already present).

• The devices and sensors are firmly secured and correctly adjusted (see adjustments)!

• No people on the worktable.

• No objects may be placed on the Smart Bridge or table which the Smart Bridge has to pass over or that can 

obstruct the passage of the Smart Bridge.

• You must ensure that the sheet material lies flat so that it does not obstruct the passage of the tacking machines.

• If deviating cases are encountered, you must immediately inform Senco.

• Ensure that children do not have access to the installation.

• During maintenance, disconnect the compressed air.

• Only persons who have read and are fully familiar with operating instructions may operate the installation.

• Safety precautions may not be removed or rendered inoperative.

• Do not place anything on or underneath the installation.

• Ensure that there is sufficient ambient lighting.

• During the work, always ensure that 1 or more persons are present.

• The installation may not be put into use before all settings and adjustments have been properly made.

• Do not reach into the installation with your hands or with objects.

• In the event of malfunctions, service personnel must be deployed.

• Work may not take place without hearing protection.

• Nothing on the installation may be modified.

• Warning signs on the installation must remain clearly legible and, if necessary, renewed.

• The system in which the Smart Load is installed must have its own safety feature to prevent unexpected stapling.

• The system in which the Smart Load is installed must have safety features and/or safety instructions to make 

working with the system safe! Verpa-Senco cannot be held liable for this!

SAFETY

Содержание SHS51XP

Страница 1: ...stad The Netherlands EMEA www senco emea com 2015 by Senco Brands Inc Installation Instructions Translation of Original Instructions Installatie handleiding Oorspronkelijke installatie handleiding Sma...

Страница 2: ...2 GB NL English 3 Nederlands 15...

Страница 3: ...chnical data 7 10 Parts of Smart Load 8 10 1 Smart Load assemby 8 10 2 Smart Load housing site 9 10 3 Smart Load Tacker with upper and vertical plate 10 10 4 Smart Load remote control 11 10 5 Smart Lo...

Страница 4: ...ucted so that it can be safely maintained and used This applies to the use the conditions and the regulations as described in this documentation Reading and adhering to this documentation and complyin...

Страница 5: ...that the sheet material lies flat so that it does not obstruct the passage of the tacking machines If deviating cases are encountered you must immediately inform Senco Ensure that children do not hav...

Страница 6: ...Template thickness 2 4mm Ensure sufficient air supply hose diameter at least 10mm Set the adjustable plate staple length no 50 in parts diagram Steel housing and staple transportation to the correct p...

Страница 7: ...r Attachment unit stalls during moving Stapling is too deep Increase distance between guide body and material Stapling depth is uneven Insufficient supply of compressed air The pressure at the Smart L...

Страница 8: ...art Load Position Description Order number A Tacker with upper and vertical plate VSP 00319 B Site cover VSP 00212 C Remote control SHS51XP VSP 00239 D Changing magazine SHS51XP VSP 00228 E Steel hous...

Страница 9: ...9 GB 1 2 10 2 Smart Load housing site Position Description Order number 1 Site housing VSP 00212 2 Bolts VSP 00247...

Страница 10: ...00216 5 Upper plate VSP 00217 6 Bolts VSP 00218 7 Valve VSP0 0219 8 Valve VSP 00220 9 Valve VSP 00221 10 pushin connector VSP 00224 11 pushin connector VSP 00223 12 O ring VSP 00225 13 verticale plat...

Страница 11: ...ector VSP 00242 4 Bolts VSP 00244 5 Cylinder VSP 00240 6 Bolts VSP 00277 10 5 Smart Load changing magazine Position Description Order number 1 Guide pin VSP 00230 2 Bolts VSP 00232 3 Magazine rail VSP...

Страница 12: ...12 GB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 29 48 49 50 51 10 6 Smart Load steel housing and staple transport...

Страница 13: ...00259 24 Bolts VSP 00260 25 Support plate staples VSP 00261 26 Cylinder VSP 00262 27 Pushin connector with flow control VSP 00263 28 Bracket cylinder VSP 00264 29 Bolt VSP 00265 30 Nuts VSP 00235 31 C...

Страница 14: ...14...

Страница 15: ...ad 19 9 Technische data 19 10 Onderdelen Smart Load 20 10 1 Smart Load assemby 20 10 2 Smart Load housing site 21 10 3 Smart Load Tacker with upper and vertical plate 22 10 4 Smart Load remote control...

Страница 16: ...derhouden en gebruikt kan worden Dit geldt voor de toepassing de omstandigheden en de voorschriften zoals in deze documentatie omschreven Het lezen en volgen van deze documentatie en het opvolgen van...

Страница 17: ...moet zorgen dat het plaatmateriaal vlak ligt zodat de hechtmachines er niet tegen aan kunnen stoten Informeer Verpa Senco direct indien men afwijkende zaken constateert Zorg ervoor dat kinderen geen t...

Страница 18: ...l dikte 2 4mm Zorg voor voldoende luchttoevoer minimaal 10 mm slang doorlaat Plaats de adjustable plate staple length nr 50 op de onderdelen tekening genaamd Steel housing and staple transportation op...

Страница 19: ...geschoten De afstand tussen guide body en materiaal groter maken Onregelmatige diepte nieten Onvoldoende toevoer perslucht De druk moet constant zijn bij de Smart Load Perslucht te laag De druk bedra...

Страница 20: ...Smart Load Position Description Order number A Tacker with upper and vertical plate VSP 00319 B Site cover VSP 00212 C Remote control SHS51XP VSP 00239 D Changing magazine SHS51XP VSP 00228 E Steel h...

Страница 21: ...21 NL 1 2 10 2 Smart Load housing site Position Description Order number 1 Site housing VSP 00212 2 Bolts VSP 00247...

Страница 22: ...00216 5 Upper plate VSP 00217 6 Bolts VSP 00218 7 Valve VSP0 0219 8 Valve VSP 00220 9 Valve VSP 00221 10 pushin connector VSP 00224 11 pushin connector VSP 00223 12 O ring VSP 00225 13 verticale plat...

Страница 23: ...ector VSP 00242 4 Bolts VSP 00244 5 Cylinder VSP 00240 6 Bolts VSP 00277 10 5 Smart Load changing magazine Position Description Order number 1 Guide pin VSP 00230 2 Bolts VSP 00232 3 Magazine rail VSP...

Страница 24: ...24 NL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 29 48 49 50 51 10 6 Smart Load steel housing and staple transport...

Страница 25: ...00259 24 Bolts VSP 00260 25 Support plate staples VSP 00261 26 Cylinder VSP 00262 27 Pushin connector with flow control VSP 00263 28 Bracket cylinder VSP 00264 29 Bolt VSP 00265 30 Nuts VSP 00235 31 C...

Страница 26: ...econditioned Products One year Senco other tools One year Senco Compressors One year www verpa senco com 85 1 Senco Professional End User Warranty Policy Considering the following constraints Senco un...

Страница 27: ...8 8218 NJ Lelystad The Netherlands Fred van Gerven Technical Manager Original Issue 2015 CONFORMITEITSVERKLARING Wij Verpa Senco B V uit Pascallaan 88 8218 NJ Lelystad Nederland in overeenstemming met...

Отзывы: