![Semi-auto EXS-128 Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/semi-auto/exs-128/exs-128_operation-and-maintenance-manual_1237460014.webp)
Chapter 5 Preparation for Operation
5-1 Connecting Electric Power
Power Switch
Power lamp
[Procedures]
Step [1] Press the power switch to turn the power OFF
Step [2] Insert the plug in the outlet.
Warning
: If the earth grounding wire is not connected an operator may get hurt due to electric shock.
Step [3] Turn the power on by pressing the power switch. power lamp starts
[Notes]
The machine can start while the heater has reached the temperature for strap welding (about 1 Min.)
The machine may not operate when the power voltage
≤
90%standard voltage
The following states occur just after power ON
The power lamp lights
Setting the power switch ON
The heater temperature starts increasing
The duct fan rotates
- 13 -
+7(977) 478-08-97
Мазур
Руслан
+7(926) 571-19-50
Мазур
Руслан
Заказ
Оборудования
и
запчастей