background image

508.366.1488 | www.semshred.com

 

 

2.

 

Unpacking Instructions 

 
The

 Model 2SSD 

has been secured to a pallet for shipping. Please inspect equipment immediately for any shipping 

damage. 
 

Important Note:

 Prior to unpacking, if there is any visible damage to the Model 2SSD or to the crate during 

shipping, the receiver must note what is damaged on the Bill of Lading and contact the shipping party 
immediately. 
 
Tools needed: 

 

Lift truck with a minimum lifting capacity of approx. 2,500lbs. (crated unit weighs ~2,050lbs.). 

 

Hammer  

 

Pry bar  

 

Strap cutters 

 
Unpacking:   

 

Remove sides of crate – 

Hammer and pry bar  

 

 

Cut straps holding Model 2SSD – 

strap cutters 

 

 

Remove the Model 2SSD from the pallet – 

lift truck  

 

Note:

 It is recommended to lift the Model 2SSD from the front with the forks 30” apart or using the fork pockets 

beneath the unit if ordered. Most of the weight will be on the right side of the Model 2SSD.  
 

Casters: 

The Model 2SSD is equipped with swivel casters for ease of handling after the unit is lifted off the pallet. 

To transport the unit, unlock all caster locks and then the unit may be pushed on a flat straight surface.   
 

Warning: 

DO NOT push the unit on an inclined or declined surface as control of the unit can be lost and personal 

injury could occur. 
 

Storage: 

If the unit requires storage, it may be stored in its shipping crate or unpackaged.  If unpackaged, ensure 

that the wheel caster locks are engaged to prevent unwanted movement of unit.  
 

Содержание 2SSD

Страница 1: ...AN 004 Created 8 5 19 ECN 00489 For Serial Numbers 19212 and up For sales service parts and customer support contact us SECURITY ENGINEERED MACHINERY 5 Walkup Drive Westborough MA 01581 info semshred...

Страница 2: ...in this collateral SEM does not warrant that the equipment will work properly in all environments and applications and makes no warranty or representation either implied or expressed with respect to...

Страница 3: ...aring loose clothing neckties dangling jewelry or long hair which may become entangled in the cutting chamber 4 Maintenance or repair of this equipment should be performed only by trained authorized s...

Страница 4: ...artup Procedures 10 4 4 Feeding and Operating Procedures 10 4 5 Clearing a Jam Accessing Stage 2 Cutting Chamber 12 4 6 Shutdown Procedures 18 4 7 Shreddable Materials 18 4 8 Unacceptable Materials 18...

Страница 5: ...oor CE Serial Number Tag Filter Access Panel Front of Cabinet IEC60320 Connector Current Relay E Stop Hour Meter Left Side Power Cord Rear of Unit E Stop Drop Chute Collection Bin Hopper Stage 2 Cutti...

Страница 6: ...6 508 366 1488 www semshred com Filter Power Cord Contactors Overloads Rear w Cover Removed Electrical Panel Fuses Electrical Panel Stage 2 Chamber Stage 1 Chamber PLC...

Страница 7: ...strap cutters Remove the Model 2SSD from the pallet lift truck Note It is recommended to lift the Model 2SSD from the front with the forks 30 apart or using the fork pockets beneath the unit if order...

Страница 8: ...o is versed in the applicable electrical codes of the country region in which this device is being installed Phase All Model 2SSDs are designed for 3 phase electricity Voltage Frequency Full Load Amps...

Страница 9: ...ds and covers are in place Ensure that the area is clean Check input area for debris discarded tools etc 4 2 Controls Start Turns the motors on one at a time to avoid large current spikes Reverse Used...

Страница 10: ...al media into this unit Doing so will damage the unit and void your warranty b Caution Feeding drives too quickly may cause a jam or damage the screen 2 When the collection bin is full the BIN FULL li...

Страница 11: ...the unit If the unit is still jammed the media may have to be removed manually 6 To release the jam de energize the unit recommended that each site has a LOTO program in place then unbolt and remove...

Страница 12: ...g Cover If for any reason the bearing cover or either bolt holding the cover on is removed or needs to be complete steps 1 4 of the procedure on page 13 and return to this section Remove no more than...

Страница 13: ...t tag out procedures LOTO 2 Open front door 3 Remove the two painted side bolts holding the cutting chamber drawer in place see figure 3 4 Note Never operate the machine without the bolts in place Req...

Страница 14: ...ull cutting chamber drawer all the way out see figure 6 a Brush should clear off any debris on top of the hopper and remain partially on the hopper once the drawer has been fully pulled out Figure 6 P...

Страница 15: ...15 508 366 1488 www semshred com b Requires 7 16 socket wrench c Bolts to be removed Figure 8 Figure 9 Belt Side Figure 10...

Страница 16: ...ting chamber the screen may need to be removed see page 22 7 Loosen the bolts of the brush and move it up so it clears the hopper Snug one bolt so it stays in position 8 Replace the gasket and hopper...

Страница 17: ...rush with the front edge of the hopper approximately below the bottom of the stage 1 cutting chamber See figures 14 and 15 Make sure the brush is positioned 1 4 inch from surface shown in pictures abo...

Страница 18: ...cleanup and maintenance procedures 4 7 Shreddable Materials The Model 2SSD is capable of destroying the following products 1 solid state hard drives CD DVD optical media with select screen sizes Thum...

Страница 19: ...rator Warning Shredded material can be sharp SEM recommends wearing gloves Stage 2 Cutting Chamber See page 10 for instructions on accessing the stage 2 cutting chamber 5 1 Daily Cleaning 1 Disconnect...

Страница 20: ...avoid excessive noise dust buildup and to ensure proper air filtration SEM recommends cleaning every 500 drives Remove the back panel opposite the cutting chamber access door Remove the plug by holdin...

Страница 21: ...f the device Warning Failure to change filters may result in hazardous particle emissions Instructions Requires 5 32 Allen wrench Unscrew 4 screws on the corners of the filter panel cover and remove c...

Страница 22: ...ith extension and lower it carefully to not spill any remaining material 4 Inspect screen for damage a Note that material resting on the screen is not considered to be adequately destroyed b Particle...

Страница 23: ...ting bolts on the motor base 7 Use the tensioning bolt on the frame to adjust the motor a See Fig 3 b Adjusting the screw clockwise will tighten the belt and counterclockwise will loosen or allow for...

Страница 24: ...material being destroyed In all cases knives should be changed and returned for sharpening at a minimum of 25 hours of usage to avoid excess dust and potential jams or post every 500 devices Note SEM...

Страница 25: ...eler gauge Spare Knives and Sharpening To avoid downtime it is best to have a spare set of sharp knives on hand at all times SEM offers spare knives and sharpening services Contact SEM Customer Servic...

Страница 26: ...quires 5 16 Allen drive socket bit 3 Remove bolts from bed knives o Replace one knife at a time o Make sure to keep track of the bed knife clamps 4 Wipe bed knife clean and place atop bed knife seat w...

Страница 27: ...t Flat side of washer should be touching clamp 6 Repeat steps 4 6 for the second bed knife 7 Wipe off rotor flats and rotor knives before attaching them one at a time with 9 3 8 24 x 3 4 socket head c...

Страница 28: ...while spinning the rotor when one or two rotor knives come into contact with the feeler gauge This indicates proper clearance There should be little resistance just a noise If the rotor stops there is...

Страница 29: ...x bolt and 5 16 lock washer Requires 1 2 wrench 12 Do a final check of bolt torques assembly bolt tightness and knife gapping Warning Failure to sharpen or replace knives will result in excess dust fr...

Страница 30: ...te Press the STOP pushbutton before making any changes to the current relay The power does not need to be off for this adjustment Remove cover on left side of device below the hour meter to expose cur...

Страница 31: ...place just enough for the shield to move Push the drawer in and pull the shield up until it touches stage 1 cutting chamber Tighten the front screw Pull the drawer out until the middle screw is in lin...

Страница 32: ...odel 2 SSD HF 2SSD 7 Case of 50 Anti Static Waste Collection Bags SSDIS ASB 8 Toolkit 553TK200 9 4 Gallon Dual Stage Vacuum 9272410 10 Vacuum Bags 2 bag 9196400 11 Replacement Vacuum Filter 9034100 Fo...

Отзывы: