background image

 

DT-E 11.11.1 BALCONY AWNING  ITALIA BALCONY 
Edition: March 2017, Issue 2 
English 

     

 

 

 

 

 

 

 

 

 

 

 

page 8 / 19 

3

 

Product installation 

 

The following part covers general requirements of the product installation. Proper installation is necessary for 
efficient  operation  of  the  product.  SELT  SP.  Z  O.O.  recommends  to  use  services  of  skilled  installation  crews 
what guarantees the Purchaser proper installation. 

3.1

 

General requirements for safe installation 

 

 

it is necessary to follow general rules of construction art 

 

it is necessary to follow health and safety regulations, especially concerning work with electricity and 
at heights, 

 

product  should  be  installed  on  even  and  dry  wall  surfaces  that  at  the  same  time  ensure  proper 
strength and are completed according to general rules of building art, 

 

before starting the installation remove all unnecessary elements from the installation area. 

3.2

 

Requirements for safe installation at heights 

 

 

Installation  of  the  product,  because  it  requires  performing  work  at  heights,  is 
particularly  dangerous  because  it  poses  a  high  risk  of  danger  to  human  health  and 
safety and in particular fall from height. 

 
Preparation of a plan on health and safety during installation is the responsibility of the Purchaser. 
 
Purchaser should determine specific requirements of health and safety when working at height, and especially 
to ensure:  

 

direct supervision of work execution by the designated person (e.g. the foreman), 

 

adequate safeguards measures, in particular protective equipment against falls from height, 

 

detailed instruction of employees performing work at heights. 

 
Work at heights above 2 meters, requiring using personal protective equipment against falls from height, must 
be performed by at least 2 people.   
 
Work at heights should be organized and carried out in a way that does not force employees to lean out of the 
railings or outline of a device on which they stand. The buyer has an obligation to ensure that areas of work at 
heights  can be  accessed only  by authorized and informed personnel. Health and safety professionals should 
inform  employees  residing  or  staying  at  the  conduct  of  such  works  or  in  the  vicinity  of  the  site  about 
conducted operations at heights and the necessary safety measures to be applied during this work. 

 

 

Содержание 11.11.1 DT-E

Страница 1: ...PRODUCT TECHNICAL AND OPERATIONAL DOCUMENTATION INSTALLATION MANUAL 11 Awnings 11 11 Balcony awning ITALIA BALCONY 11 11 1 Installation manual Documentation no 11 11 1 EN 11 11 1 DTE...

Страница 2: ...cturer s name SELT Sp z o o Manufacturer s head office 45 449 Opole ul Wschodnia 23A Website www selt com Plant address Wydzia Produkcji Markiz 45 449 Opole ul Wschodnia 23A Contact details Tel 48 77...

Страница 3: ...installation 8 3 1 General requirements for safe installation 8 3 2 Requirements for safe installation at heights 8 3 3 Preparation to installation 9 3 4 General guidelines for installation 9 3 5 Ins...

Страница 4: ...Directive 2001 95 EC of the European Parliament and the Council DZ U Journal of Laws of 12 December 2003 No 229 item 2275 as amended 1 2 Notes on symbols and marks The below symbols icons denote part...

Страница 5: ...ocumentation is valid jointly with the information concerning a specific product which is available on the website www selt com The documentation is a component of product delivery and should be const...

Страница 6: ...tube diameter 70 mm Arms Lowered aluminum Tilt angle 0 160 Manual drive Crank 1 5 m 1 8 m 2 2 m Optional hood No Construction colour White beige brown silver structural graphite Fabric C 140 patterns...

Страница 7: ...DT E 11 11 1 BALCONY AWNING ITALIA BALCONY Edition March 2017 Issue 2 English page 7 19 2 2 Italia awning construction...

Страница 8: ...se it poses a high risk of danger to human health and safety and in particular fall from height Preparation of a plan on health and safety during installation is the responsibility of the Purchaser Pu...

Страница 9: ...hand and fingers harm during opening and closing of the awning the awning should be installed on such height so that the lowest element of the awning after it is opened is at least 2200mm above the gr...

Страница 10: ...s hammer drill drills ladder scaffolding screw driver hammer measure tape pencil marker spirit level ring flat wrenches Allen keys anchors 3 6 Italia Balcony awning installation For base uncracked con...

Страница 11: ...marking installation spots for brackets Level the bracket vertically with spirit level and mark places for installation holes 3 Drill in marked places 4 Fix installation anchors 5 Install wall bracket...

Страница 12: ...ket on the round pin with slide bearing a 9 Level the awning horizontally with spirit level b 10 Mark the installation spot for the second bracket Pay particular attention so that brackets are install...

Страница 13: ...13 19 12 Fix installation anchors 13 Screw on the bracket 14 Set up the awning with plug and square pin on the bracket from the drive side 15 Put the awning with the round pin and slide bearing into...

Страница 14: ...king the fixing spots for arm brackets on the balustrade 18 Drill holes in marked spots 19 Fix the arm to the balustrade 20 Fix the second arm in the same manner 21 Slide eyelets to the groove in the...

Страница 15: ...Y AWNING ITALIA BALCONY Edition March 2017 Issue 2 English page 15 19 23 Secure the eyelets with screws 24 Fix the front bar side covers with screws 25 The eyelets can be also fix to the arm hook as s...

Страница 16: ...th a handwheel After setting the tilt angle proper fabric tension is provided by slightly rolling up the excess of fabric Gears 11 1 are not equipped with overturn protection so called mechanical end...

Страница 17: ...screpancies in quantity or possible replacements of parts being the evident result of Selt SP Z O O fault the company agrees to supplement or replace in the shortest possible time 4 2 General conditio...

Страница 18: ...mission Regulation EC No 574 2004 of 23 February 2004 amending Annexes I and III to Regulation EC No 2150 2002 of the European Parliament and of the Council on waste statistics Regulation of the Minis...

Страница 19: ...ssue 2 English page 19 19 b Marking on accompanying documents SELT Sp z o o OPOLE ul Wschodnia 23A POLAND 07 EN 13561 Balcony awning ITALIA BALCONY 500x70 For external use Wind load resistance 1 class...

Отзывы: