![Sel 751A Скачать руководство пользователя страница 235](http://html1.mh-extra.com/html/sel/751a/751a_instruction-manual_1236402235.webp)
5.17
Date Code 20100129
Instruction Manual
SEL-751A Relay
Metering and Monitoring
Breaker Monitor
The following settings are made from the breaker maintenance information in
and
shows the resultant breaker
maintenance curve.
COSP1 =
10000
COSP2 =
150
COSP3 =
12
KASP1 =
1.20
KASP2 =
8.00
KASP3 =
20.00
Figure 5.17
Plotted Breaker Maintenance Points for a 25 kV Circuit Breaker
10,000
1000
2
3
4
5
6
7
8
9
100
2
3
4
5
6
7
8
9
10
2
3
4
5
6
7
8
9
1
2
3
4
5
6 7 8 9
50
40
30
20
10
.5
Number of Close/Open Operations
kA Interrupted per Operation
Содержание 751A
Страница 1: ...20100129 SEL 751A Feeder Protection Relay Instruction Manual PM751A 01 NB...
Страница 6: ...This page intentionally left blank...
Страница 12: ...This page intentionally left blank...
Страница 18: ...This page intentionally left blank...
Страница 26: ...This page intentionally left blank...
Страница 92: ...This page intentionally left blank...
Страница 218: ...This page intentionally left blank...
Страница 250: ...This page intentionally left blank...
Страница 376: ...This page intentionally left blank...
Страница 392: ...This page intentionally left blank...
Страница 408: ...This page intentionally left blank...
Страница 418: ...This page intentionally left blank...
Страница 434: ...This page intentionally left blank...
Страница 462: ...This page intentionally left blank...
Страница 544: ...This page intentionally left blank...
Страница 580: ...This page intentionally left blank...
Страница 584: ...This page intentionally left blank...
Страница 632: ...This page intentionally left blank...
Страница 636: ...This page intentionally left blank...
Страница 640: ...This page intentionally left blank...