![Sejoy UA-105 Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/sejoy/ua-105/ua-105_owners-booklet_1236238029.webp)
Control
solution
testing
Performing a control test
⑤
Touch and hold the hanging drop of control
solution where the narrow channel meets the
TOP EDGE of the test strip. Make sure the
confirmation window fills completely. Control
solution should not be applied to the flat face of
the test strip.
CONFIRMATION
WINDOW
⑥
Read the result on the meter
When the confirmation window is full, the meter will
count down from 20 to 1. uric acid level appears
on the display, along with the unit of measure, the
date and time of the test.
The results are automatically stored in the meter’s
memory.
TOP
EDGE
NARROW CHANNEL
Apply Drop Here
27
o
Содержание UA-105
Страница 1: ...Owner s Booklet UA 105 Monitoring System Uric Acid ...
Страница 2: ......