background image

Paxi Island bath installation

Island installation

 — see diagram below — there is a ledge between the wall and the side of the bath.   

The minimum setout from the wall is 100mm.  Refer to the local authority for local setout requirements.

Ensure that the area under the bath is 

ventilated

 in accordance with local requirements.

page 2 of 2

 

suitable moisture barrier

standard 40mm 

waste outlet

unfinished 

floor

run-off tube

tiles

sealant

grade sub-floor  

1:60 minimum (or 

local requirement)

wall

wall

compressed cement  

fibre sheet backing
tiling

sealant

fill
water stop

100 

minimum setout

 

(or local requirement)

Island installation

s e i m a . c o m . a u

Please note

 

All measurements are in millimetres.  

 

Dimensions are nominal and subject to normal ceramic manufacturing variations of ±5mm. 

 

Fixing: Use acetic cured silicone sealant. Do not use epoxy type adhesives.

 

Specifications may vary without notice as part of our continuous improvement practices.

 

Clean with a damp cloth. Do not use abrasive cleaners, liquids or pastes.

Отзывы: