![Seiko 6R20A Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/seiko/6r20a/6r20a_technical-manual-and-parts-catalogue_1235376020.webp)
1. Lubricate the date jumper as illustrated.
3 Auxiliary train wheel bridge
4 Auxiliary train wheel bridge screws (4 pcs)
Type of oil: AO-3 (Moebius A)
2. Lubricate the day jumper as illustrated.
Type of oil: AO-3 (Moebius A)
3. Set the auxiliary train wheel bridge.
4. Tighten the auxiliary train wheel bridges
screws. (4 pcs)
ReAssemble the movement
19
TECHNICAL GUIDE
Cal. 6R20A
20/24