Figure 1
INSERT 4PCS WOOD DOWEL (B) AND 6PCS
CAM BOLT (A) ONTO CORRESPONDING
HOLES OF LEFT AND RIGHT FRONT PILLAR
(2) AND FIT INTO CORRESPONDING HOLES
OF LEFT AND RIGHT SIDE PANEL (2),THEN
INSERT 6PCS CAM-LOCK (C) INTO BIG
HOLES ON EDGES OF SIDE PANELS (1)
WITH SLOT FOR SCREWDRIVER FACING
OUTWARD,ROTATE CAM-LOCK CLOCKWISE
TO SESURE CAM BOLT AS FIGURE 1
SHOWN.
Figure 2
INSERT 2PCS WOOD DOWELS (B) AND 2PCS
CAM BOLT (A) INTO PREDRILLED HOLES ON
END OF LEFT AND RIGHT FRONT PANELS (4)
AND FIT INTO CORRESPONDING HOLES OF
LOWER FRONT PANEL (5),THEN INSERT
2PCS CAM-LOCK (C) INTO BIG HOLES ON
EDGES OF BELOW FRONT PANEL(5) WITH
SLOT FOR SCREWDRIVER FACING
OUTWARD,ROTATE CAM-LOCK CLOCKWISE
TO SESURE CAM BOLT AS FIGURE 2
SHOWN.
Figure 3
INSERT 2PCS WOOD DOWEL (B) AND 2PCS
CAM BOLT (A) INTO PREDRILLED HOLES ON
END OF UPPER FRONT PANEL (3) AND FIT
INTO CORRESPONDING HOLES OF FRONT
PANEL (L&R)(4), THEN INSERT 2PCS
CAM-LOCK (C) INTO BIG HOLES ON EDGES
OF FRONT PANELS (L&R)(4) WITH SLOT FOR
SCREWDRIVER FACING OUTWARD,ROTATE
CAM-LOCK CLOCKWISE TO SESURE CAM
BOLT..AS FIGURE 3 SHOWN.
"SUSSEX BRAID" FIREPLACE
Assembly Instructions