
Section 3: Operations
Operational Procedures
RainDrain Operations Manual
(Version D)
8
We Engineer Solutions
Section 3: Operations
Operational Procedures
Before operating the system, ensure that the connections from the bulkhead fitting to the filter casing are
correct.
To begin operation, simply turn the valve into the open position, thus allowing the fluid to travel through the
hose/fittings assembly to the filter element.
Important Note
Always place the filter casing at a lower level than the bottom of the berm liner. This allows all
the water to drain and ensures all absorption materials are utilized. If the filter inlet is higher than
the base of the berm, the discharge flow will be reduced.
Valve in open position.
Valve in closed position.