Section 4: Flight Operations
Landing
2016 Bambi MAX Operations Manual
(Version C)
13
We Engineer Solutions
Landing
The recommended landing procedure is to allow the bucket to touch down ahead of the helicopter and then
maintain tension on the suspension lines by backing up slightly. Do not drag the Bambi MAX over rough
surfaces when landing or ground handling. This will damage the bucket shell.
Caution
When the Bambi MAX is taken out of daily operation, leave the valve partially open which will
extend the life of the seal.