16
www.seuservice.com
www.seuservice.com
17
ASSEMBLY CHECK
In the TEST MODE, ascertain that the assembly has been made correctly and IC BD is satisfactory
(refer to Section 9).
In the test mode, perform the following test:
( ) MEMORY TEST
Selecting the RAM TEST in the test mode
menu causes the on-board memory to be tested
automatically. The game board is satisfactory if the
display beside each IC No. shows GOOD.
( ) C.R.T. TEST
In the test mode menu, selecting C.R.T. TEST allows the screen
(on which the projector is tested) to be displayed. Although the
projector adjustments have been made at the time of shipment
from the factory, color deviation, etc., may occur due to the effect
caused by geomagnetism, the location building's steel frames and
other game machines in the periphery. By watching the test mode
screen, make judgment as to whether an adjustment is needed. If
it is necessary, adjust the projector by referring to Section 14.
RAM TEST
IC29 GOOD
IC35 GOOD
IC09 GOOD IC10 GOOD
IC11 GOOD IC12 GOOD
IC16 GOOD IC18 GOOD
IC20 GOOD IC22 GOOD
IC17 GOOD IC19 GOOD
IC21 GOOD IC23 GOOD
PRESS TEST BUTTON TO EXIT
C.R.T. TEST 1/2
1 32
RED
GREEN
BLUE
WHITE
PRESS TEST BUTTON TO CONTINUE
C.R.T. TEST 2/2
PRESS TEST BUTTON TO EXIT
1
2
4
Содержание WaveRunner GP
Страница 2: ...VISIT OUR WEBSITE...
Страница 8: ...NOTES...
Страница 53: ...www seuservice com 45 COIN DOOR...
Страница 74: ...66 www seuservice com Notes...
Страница 76: ...SEGAAMUSEMENTS USA INC...