Sega Saturn Taget Box Скачать руководство пользователя страница 1

     

N O T I C E

     

When using this document, keep the following in mind:

1.

This document may, wholly or partially, be subject to change without notice.

2.

All rights are reserved: No one is permitted to reproduce or duplicate, in any form, 

the whole or part of this document without SEGA’s permission.

3.

SEGA will not be held responsible for any damage to the user that may result from 

accidents or any other reasons during operation of the user’s equipment, or programs

according to this document.

4.

Software, circuitry, and other examples described herein are meant merely to
indicate the characteristics and performance of SEGA’s products.  SEGA assumes no 

responsibility for any intellectual property claims or other problems that may result 
from applications based on the examples describe herein.

5.

No license is granted by implication or otherwise under any patents or other rights 

of any third party or SEGA Enterprises, Ltd.

6.

This document is confidential.  By accepting this document you acknowledge that 

you are bounded by the terms set forth in the non-disclosure and confidentiality 
agreement signed separately and/in the possession of SEGA.  If you have not signed 
such a non-disclosure agreement, please contact SEGA immediately and return this 
document to SEGA.

(4/20/94 - 001)

Содержание Saturn Taget Box

Страница 1: ...rein are meant merely to indicate the characteristics and performance of SEGA s products SEGA assumes no responsibility for any intellectual property claims or other problems that may result from appl...

Страница 2: ...TM SEGA Saturn Target Box User s Manual Programming Box Graphics Box Provisional Version Doc ST 174 R2 090294 SEGA 1994SEGA Allrightsreserved...

Страница 3: ...eted with the assistance of the technical literature listed below 1 KenKyusha New Japanese English Dictionary 1974 Edition 2 Nelson s Japanese English Character Dictionary 2nd revised version 3 Micros...

Страница 4: ...This page was blank in the Japanese original...

Страница 5: ...History Version 1 July 15 1994 New creations for use in the SEGA Saturn Programming Box Graphics Box...

Страница 6: ...just Target Box This system is used for developing SEGA Saturn game software This system has functions for efficient development as well as the same functions as the custom chip used in Saturn The fun...

Страница 7: ...sound function is an environment for producing game sounds The following functions can be used SCSP function Sound board control CPU MC68EC000 A Bus Board The A Bus board is for interfacing with the A...

Страница 8: ...le pins EVA Board Evaluation Board This indicates SH 2 EVA board and the emulator for emulating main CPU SH 2 CPU of Target Box SH 2 Board The SH 2 CPU being the main control CPU is mounted on this bo...

Страница 9: ...ST 174 R2 090294 SEGA Enterprises Ltd RDJ 7 18 94 iv This page was blank in the Japanese original...

Страница 10: ...acking and Installation 9 2 1 Unpacking and Inspecting Accessory Parts 10 2 2 Target Box Installation 11 Installation Environment 11 2 3 Connecting the ICE 12 Removing the Target Box Main Cover 12 Rem...

Страница 11: ...er ON Reset Switch 24 Reset Switch 25 Master Slave EVA Board Reset Switch 25 Summary of the Reset Relationships 25 3 2 Graphics Program Development Environment 26 Connector Name 26 AV OUT Signal Conne...

Страница 12: ...sockets 14 Figure 2 6 Method for connecting ICE 14 Figure 2 7 Rear View 15 Figure 2 8 Location of connector for EVA board connections 18 Figure 2 9 Location of connector for PAD 20 Chapter 3 Descript...

Страница 13: ...ST 174 R2 090294 SEGA Enterprises Ltd RDJ 7 18 94 viii This page was blank in the Japanese original...

Страница 14: ...ST 174 R2 090294 SEGA Enterprises Ltd RDJ 7 18 94 1 Chapter 1 Appearance 1 1 The Appearance and Name of Each Section 2 Front View 2 Right Side View 4 Rear View 5 Top View 6...

Страница 15: ...1 1 The Appearance and Name of Each Section The appearance of Target Box is shown in Figures 1 1 1 6 See Chapter 3 for more details on each section Front View 10 1 2 3 4 5 6 7 8 9 11 12 Figure 1 1 Tar...

Страница 16: ...ST 174 R2 090294 SEGA Enterprises Ltd RDJ 7 18 94 3 Figure 1 2 Target Box Front View Graphics Box...

Страница 17: ...is a 1 player connector and right side is a 2 player connector 4 Panel Switch 5 Environment Setting Switch 6 SCSI II Connector 7 RS 232C Connector 8 Serial Connector 9 Power Switch 10 Built in CD dri...

Страница 18: ...ST 174 R2 090294 SEGA Enterprises Ltd RDJ 7 18 94 5 Right Side View Figure 1 3 Target Box Right Side View...

Страница 19: ...2 090294 SEGA Enterprises Ltd RDJ 7 18 94 6 Rear View Figure 1 4 Target Box Rear View Section names are shown in Figure 1 4 and are further explained in Chapter 3 1 AC Inlet 2 ICE EVA board SH 2 Board...

Страница 20: ...ST 174 R2 090294 SEGA Enterprises Ltd RDJ 7 18 94 7 Top View 3 4 Figure 1 5 Programming Box Top View Figure 1 6 Graphics Box Top View...

Страница 21: ...td RDJ 7 18 94 8 Section names are shown in Figures 1 5 and 1 6 and are further explained in Chapter 3 1 Cartridge connector connection segment 2 CD drive The CD drive is loaded only in the Programmin...

Страница 22: ...ST 174 R2 090294 SEGA Enterprises Ltd RDJ 7 18 94 9 This page was blank in the Japanese original...

Страница 23: ...t 11 2 3 Connecting the ICE 12 Removing the Target Box Main Cover 12 Removing the SH 2 Board 14 ICE Connection 14 Installing the Main Cover of the Target Box 16 ICE Environment Settings 17 2 4 Connect...

Страница 24: ...roken or missing items See Chapter 4 for more information 1 Target Box 2 AC Cable 3 Sega Saturn Target Box User s Manual 4 Pad Cables 2 lengths 5 AV Cable 6 Eva Board Reset Cable 2 lengths 8 Package L...

Страница 25: ...in extremely high or low temperature or near strong vibration Do not use the same AC outlet for the equipment which cause noise i e large motor etc Do not place any objects on top of the Target Box C...

Страница 26: ...plies of all peripheral devices connected to the Target Box are OFF 2 Remove the main cover of the Target Box There are four screws to be removed See Figure 2 2 3 Loosen the two screws on the ICE EVA...

Страница 27: ...T 174 R2 090294 SEGA Enterprises Ltd RDJ 7 18 94 14 Loosen these screws Note When not connecting ICE POD make sure to close slide cover secure on top Figure 2 3 ICE EVA board SH 2 board plug port cove...

Страница 28: ...o add one to a side without the SH 2 mounted to it For more information please contact SEGA For details refer to chapter 4 support center ICE Connection The 171 pin PGA socket is visible when the SH 2...

Страница 29: ...board make sure to remove the attached ICE PGA plug also Otherwise when installing EVA board it could come in contact with the bottom surface Main Board Pin ICE POD Lead PGA Plug A1 Pin PGA Socket fo...

Страница 30: ...frame and tighten the four screws See Figure 2 2 2 Adjust position height of the rear ICE EVA board SH 2 board plug port cover so that ICE POD is in a horizontal position ICE POD will then be secured...

Страница 31: ...ST 174 R2 090294 SEGA Enterprises Ltd RDJ 7 18 94 18 Figure 2 7 ICE Connection...

Страница 32: ...ing Box Graphics Box When Master Side is ICE MODE C RET E7000 MODE MD5 0 xx 0E RET MODE SET C CONFIGURATION U USER M MASTER SLAVE X C RET CONFIGURATION WRITE OK Y N Y RET When Slave Side is ICE MODE C...

Страница 33: ...2 Remove the main cover on Target Box 3 Loosen the screws of the ICE EVA board SH 2 board plug port cover and slide downward Removing the SH 2 Board If an SH 2 board is mounted to the SH 2 board EVA...

Страница 34: ...oard side connector CN8 the lowermost board Connector to the Target Box CN10 EVA board Reset Cable When Eva board is connected to the Master Side EVA board side connector CN8 the uppermost board Conne...

Страница 35: ...r s manual Example of Short Pin Setting Method for Programming Box Graphics Box No 10 PSCB Clock setting PSCB2 J14 2 3 short J15 1 2 short Other J1 J13 OFF Caution When the EVA board is not set correc...

Страница 36: ...Controller Connector Location The connector for the controller cable is on a circuit board which is visible from the front of the Target Box See Figure 2 10 Figure 2 10 Location of connector for Contr...

Страница 37: ...or the host computer PC AT that is connected to ICE or EVA board b turn on the power of the E7000 body 2 Turn on the power of any peripherals connected to Target Box 3 Turn on the power of the Target...

Страница 38: ...SMPC Reset Switch 24 Power ON Reset Switch 24 Reset Switch 25 Master Slave EVA Board Reset Switch 25 Summary of the Reset Relationships 25 3 2 Graphics Program Development Environment 26 Connector Nam...

Страница 39: ...l switch names SMPC Reset Switch This switch resets the SMPC system manager The real time clock RTC and SMPC internal 4 byte backup memory SMEM are also initialized 256K byte backup memory is not affe...

Страница 40: ...Reset Relationships Table 3 1 Summary of reset relationships Panel Switches Master EVA Board Slave EVA Board ICE Main Board System Manager SMPC CDDrive Start up of Target Box X X X O X O SMPC Reset X...

Страница 41: ...or for graphics development environment graphics connector is shown in Figure 3 2 See the Front View and Top View sections in Chapter 1 for the locations of these connectors Figure 3 2 Graphics connec...

Страница 42: ...lease contact Sega technical support center Also please see support center in chapter 4 3 AV OUT Connector Outputs the signal for displaying graphics Connect the attached AV cable and use AV OUT Conne...

Страница 43: ...ST 174 R2 090294 SEGA Enterprises Ltd RDJ 7 18 94 30 OFF Return switch to horizontal position Side View ON Push switch down Figure 3 4 Switches for setting environments...

Страница 44: ...MM cartridge area Do not layout SIMM cartridge area 6 SCSI 2 7 SCSI 1 SCSI ID Number 8 SCSI 0 Table 3 Note Areas with double line frames are settings at shipment time Table 3 3 Table of Area Code Sett...

Страница 45: ...N ON ON ON Note 1 Boot from the SCSI when x mark is ON and use graphics tool When OFF select the setting where it does not boot up Note 2 Select the setting so that the SIMM is configured in the cartr...

Страница 46: ...A SIMM is installed on IC11 see Figure 3 5 at the time the Programming Box is shipped The user can add SIMMs to SIMM sockets IC12 IC13 and IC14 Expanded memory has been prepared as an option with our...

Страница 47: ...Socket Power Supply Connector 1 Insert SIMM from the side and at an angle into the SIMM socket railing 2 After inserting SIMM into the railing stand it upright Removal SIMM socket top view 1 By liftin...

Страница 48: ...ST 174 R2 090294 SEGA Enterprises Ltd RDJ 7 18 94 35 Chapter 4 Customer Support Service Chapter 4 Customer Support Service 33 4 1 Customer Support Service Information 34...

Страница 49: ...r missing or broken parts on the Saturn Target Box please contact the Technical Support Department 1 For Technical Inquires Company SEGA of America Department Technical Support Address 275 Shoreline D...

Отзывы: