18
ASSEMBL
Y AND
INST
ALLA
TION
6
• Make sure that all the adjusters contact the floor. Otherwise the cabinet could
move, causing an accident.
• Provide a ventilation space at least 15cm wide behind the cabinet. There are
ventilation holes on the back of the cabinet. Do not block the ventilation holes.
Doing so could trap heat inside resulting in fire. It could also result in equipment
damage or cause parts to become exhausted prematurely.
The product is equipped with 4 casters and 4 adjusters.
When installation position / site has been determined, have the adjusters come in direct contact with the floor.
Establish a gap of about 5 mm between the floor and the casters and adjust the unit so that it will remain level.
1 Move the product to the installation site.
2 Bring the adjusters into direct contact with the floor. Use a wrench to align the height of the adjusters until the
cabinet is perfectly level.
3 After setting, turn adjuster nuts upwards to tighten them and secure adjuster heights.
Approx. 5 mm
ADJUSTER
Fasten the nuts in an
upward direction.
ADJUSTER
CASTER
6-3 FIXATION TO SITE
CASTORS
CASTORS
ADJUSTERS
ADJUSTERS
Содержание PIRATES of MONSTER ISLAND
Страница 7: ...vi INTRODUCTION Notes Intentionally left blank...
Страница 70: ...COIN HANDLING 61 12 STERLING PRICE OF PLAY SETTINGS SW1...
Страница 71: ...62 COIN HANDLING 12 EURO PRICE OF PLAY SETTINGS SW1...
Страница 85: ...76 DESIGN RELATED PARTS 18 For the warning display stickers refer to Section 1 18 DESIGN RELATED PARTS...
Страница 91: ...82 WIRING DIAGRAMS 21 D 1 3 21 SCHEMATIC DIAGRAMS...
Страница 92: ...83 WIRING DIAGRAMS 21 D 2 3...