Table of Contents
SPECIFICATIONS
1
DEFINITION OF SERVICE ENGINEER AND MAINTENANCE MAN
2
CONCERNING THE STICKER DISPLAY
3
CONCERNING WARNING DISPLAY
3
HANDLING PRECAUTIONS
4
PRECAUTIONS CONCERNING INSTALLATION
5
INSTALLATION SPACE REQUIRED
6
NAME OF PARTS
7
ACCESSORIES
8
PAYING ATTENTION TO CUSTOMERS
9
PRECAUTIONS TO BE HEEDED (BY CUSTOMERS) DURING THE OPERATION
10
ASSEMBLING WITH PRECAUTIONS
12
ASSEMBLING THE DISPLAY CABINET
13
PRECAUTIONS TO BE HEEDED BEFORE STARTING THE OPERATION
17
SECURING INTO PLACE
18
INSTALLING POWER CABLES
19
TURNING THE POWER ON
20
BASIC GAME CONTENT
23
BASIC GAME CONTENT - OVERVIEW
24
HOW TO PLAY
25
TEST MODE
37
GAME TEST MODE
52
MAINTENANCE
53
DLP DISPLAY
61
PC REMOVAL and CONNECTIONS
63
CONNECTIONS FOR NETWORK PLAY
65
COIN TOWER - OPERATION
67
DESIGN RELATED PARTS
72
Содержание Ford Racing Full Blown Deluxe
Страница 20: ...STEP 7 Fit the cover plate over the JOINT BKTS and secure using 4x M8X30 bolts black Complete...
Страница 74: ...EXCEL BOARD COIN SETTINGS UK...
Страница 75: ...EXCEL BOARD COIN SETTINGS 71...
Страница 77: ...73...
Страница 78: ......
Страница 79: ...75...