background image

Résines SEFACO inc. 1, plage Beauchesne (Québec) G6R 0B4 Canada, Tél.: 819-357-8372  Fax: 819-357-8373

UCTIONS

UCTIONS

CONTENTS :

CONTIENT :

A -

Posts  (4)  --96" high

A-

Poteaux (4)  -- 96" de haut

B -

Caps for posts (4) 

B-

Capuchon pour poteaux (4)

C -

Treillis supports  (6) -- 22"

C-

Supports à Treillis (6)  --  22" 

D -

Horizontal treillis  (8) --20½"

D-

Treillis Horizontal (8)  --  20½"

E - 

Short top pickets (8)  -- 32"

E - 

Treillis Supérieur (8)  --  32"

F

Vertical Center pickets (2)  61¾"

F -

Piquets Vertical Central (2)  --  61¾" 

1  -

1

F -

Vertical Side pickets (4)  61¾"

F -

Piquets Vertical Latéral (4)  --  61¾" 

2

 

2

G -

Long top pickets (5)  -- 61¾"

G-

Piquets pour Treillis Supérieur (5)  --  61¾"

H -

End Caps (40)

H-

Embouts (40)

F1

F2

G

H

A

C

D

E

B

TOC 9648

GUIDE D’ASSEMBLAGE

ASSEMBLY INSTRUCTIONS

Содержание TOC 9648

Страница 1: ...R sines SEFACO inc 1 plage Beauchesne Qu bec G6R 0B4 Canada T l 819 357 8372 Fax 819 357 8373 TOC 9648 TOR 9648 GUIDE D ASSEMBLAGE ASSEMBLY INSTRUCTION...

Страница 2: ...rts 6 22 C Supports Treillis 6 22 D Horizontal treillis 8 20 D Treillis Horizontal 8 20 E Short top pickets 8 32 E Treillis Sup rieur 8 32 F Vertical Center pickets 2 61 F Piquets Vertical Central 2 6...

Страница 3: ...tel que d montr et ins rer les embouts C et D tel qu illustr G E STEP 2 Assemble top of arbour as shown Fig 1 You have already inserted the end caps in the extremities of pickets E and G TAPE 2 Assem...

Страница 4: ...ux extr mit s STEP 4 Insert your side trellisses into 2 and secure into soil or cement bases Post A should be sunk approximately 18 into ground or cement TAPE 4 Ins rer les treillis lat raux l int rie...

Страница 5: ...ts Treillis 6 22 D Horizontal treillis 8 20 1 2 D Treillis Horizontal 8 20 1 2 E Short top pickets 9 24 E Treillis Sup rieur 9 24 F Vertical Center pickets 2 61 3 4 F Piquets Vertical Central 2 61 3 4...

Страница 6: ...E 1 Tout d abord assembler les treillis lat raux Identifier les pi ces F1 et F2 tel que d montr et ins rer les embouts C et D tel qu illustr STEP 2 Assemble top of arbour as shown Fig 1 TAPE 2 Assembl...

Страница 7: ...rellisses into 2 and secure into soil or cement bases Post A should be sunk approximately 18 into ground or cement TAPE 4 Ins rer les treillis lat raux l int rieur des parties 2 et placer les poteaux...

Отзывы: