background image

10

OPERATING MODE

                Earth point must be connected to grounding source

STEP 1:  Switch ON MAIN AC SUPPLY (white indicator light ON)
STEP 2:  Press + or - button activate heating. 
 

 P0 = Off

                  P1 = Low Temperature
 

 P2 = Medium Temperature

 

 P3 = High Temperature

STEP 3:  Turn ON water supply. 
STEP 4:  For R23RT, pump opreation is default, press      to off pump. Press ‘pump’ to   
                  activation if needed.

Remarks: Without water supply will stop the heating system and pump operation. 

TESTING THE Residual Current Device (RCD)

STEP 1:  Press TEST button to test bulid in RCD. Display E1 on 
                 screen. 
STEP 2:  Press RESET to reset the system and back to normal 
  

operation.

Remarks: As long as incoming main supply is present, the white indicator light is ON.

P2

e 1

Содержание F23HT

Страница 1: ... INSTANT WATER i HEATER INSTALLATION MANUAL MODEL F23HT R23RT Please read manual carefully before installation SEERS reserve the rights to change the contents and illustrative diagrams without prior notice ...

Страница 2: ......

Страница 3: ...1 Important Safety Information 2 Part Contents Checklist 4 Parts Description 5 Hand Shower Installation Guide 7 Water requirements 8 Installation 9 Operating Mode 10 Model Specification 11 Troubleshooting 12 CONTENT ...

Страница 4: ... use Pass on this guide in the event of change of ownership of the installation site All warnings cautions and instruction contained in this guide must be followed When this appliances has rejected the end of its serviceable life its should be disposed of in a safe manner in accordance with current local authority recycling or waste disposal policy This appliance is not intended for use by persons...

Страница 5: ...r earthing system should have least electrical resistance good corrosion resistance and ability of dissipating high faulty current Consideration should be given by the young the elderly the infirm or anyone inexperienced in the correct operation of the control as well as children should be supervised to ensure that they do not play with the appliances When the Shower is used by someone such as chi...

Страница 6: ... 5 This switch must be out of reach of a person using a shower 6 The use of a plug and socket is not recommended 7 Correct size of wire conductor corresponding to different electrical loading should be used Recommended power cable size Model Cable size F23HT 4mm R23RT 4mm 8 In order to avoid a hazard due to inadvertent resetting of the thermal cutout this appliances must not be supplied through an...

Страница 7: ...PART CONTENTS CHECKLIST Model R23RT F23HT 1 x Shower Holder complete with sliding bar 1 x Rubber Hose 1 x Hand Shower 1 x Regulator Valve 1 x Seers Heater Unit 4 x Green Wall Plug Screw Set 4 ...

Страница 8: ...PART DESCRIPTION 1 AC Supply Cable Inlet 2 Regulator Valve water Inlet 3 Hand Shower 4 Shower Holder 5 Hose 6 Sliding Bar 1 2 3 4 6 5 5 Model R23RT F23HT ...

Страница 9: ...PART DESCRIPTION Optional with Rain Shower 1 Rain Shower Head 2 Rain Shower Sliding Bar 3 Shower Holder 4 3way Diverter Valve 5 Hose 6 Hose 1 2 3 5 6 4 6 ...

Страница 10: ...HAND SHOWER INSTALLATION GUIDE 7 WALL SIDE VIEW FRONT VIEW ...

Страница 11: ... unit works at minimum water flow of 2 litre min 1 5 m min Plumbing Schematic Diagram Seers Eco Instant Water Heater can be fitted in your home regardless of the the type of plumbing system as in most cases they can operate directly off main cold water supply ...

Страница 12: ... at the bottom to remove front cover 2 Drill hole on wall to mount heater according to hole position 3 Affix flexible hose at outlet red and cold water supply to inlet blue 4 Connect AC Supply cable to terminal blocks 5 Fix front panel and fasten screw 1 2 4 5 3 L N E RED BLUE GREEN YELLOW BROWN BLUE GREEN YELLOW Cold Water IN Blue Hot Water OUT Red ...

Страница 13: ...water supply STEP 4 For R23RT pump opreation is default press to off pump Press pump to activation if needed Remarks Without water supply will stop the heating system and pump operation TESTING THE Residual Current Device RCD STEP 1 Press TEST button to test bulid in RCD Display E1 on screen STEP 2 Press RESET to reset the system and back to normal operation Remarks As long as incoming main supply...

Страница 14: ...cal Rated power 3 0 Kw 3 0 Kw Rated voltage 220 240VAc 1phase 220 240VAc 1phase Rated current 13 Amp 13 Amp Connecting cable size 4 0mm2 4 0mm2 Output temperature 35 c 45 c 35 c 45 c IP IP25 IP25 Minimum Flow 2L min 2L min Maximum Flow 6L min 6L min Min Inlet Water Pressure pascals Max Inlet Water Pressure pascals 100 000 100 000 350 000 350 000 Inlet and Outlet BSP BSP RCD Rated Trip Current Mode...

Страница 15: ... POSSIBLE CAUSE REMEDIES Heater not operating 1 No Power Supply 1 Check incoming power source 2 Water shortage 2 Check incoming water 3 Filter clogged 3 Clean Filter Water not hot 1 System trip 1 Press reset 2 Heating position not set 2 Press 3 Water flow rate too high 3 Control water at regulator valve TROUBLESHOOTING Error Code ELCB tripped E1 Press RESET button Overheat E2 Please refer to custo...

Страница 16: ...SEERS MARKETING SDN BHD 917949 V No 4 Jalan Utarid U5 18A Seksyen U5 40150 Shah Alam Selangor Darul Ehsan Malaysia Tel 603 7842 2871 Fax 603 78439971 Email sales seers com my Website www seers com my ...

Отзывы: