Rostock MAX v2 Assembly Guide
Routing the wires & binding them.
For this task, you'll need seven small wire ties.
Let's pull the four 18ga wires from the Z tower and the four 26ga wires from the Y tower
through the center hole in the top plate. Carefully feed 30” of wire as measured from the top plate.
This will give you plenty of length to work with when it comes time to wire up the hot end.
107
Fig. 7-36: Routing the hot end wires.
Fig. 7-36A: Wires pulled.
Содержание Rostock MAX v2
Страница 25: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 1 25 ...
Страница 26: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 2 Melamine Parts Sheet 3 26 ...
Страница 27: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 4 27 ...
Страница 171: ...Rostock MAX v2 Assembly Guide 171 Fig 14 8 Spool holder support installed ...