LinkStar-H68K-C D F
Model Routing
-
Quick
Start Guide
Full
text
Document version
20220901
9
2.4
Broadband dial-up routing and network allocation
methods
●
The
C D
version is recommended for the first level of routing to the home network,
in the weak box, without
WIFI.
2.4.1
Device connection topology diagram
2.4.2
Distribution methods
●
Step 1: Connect the wire sequence
Connect the wire sequence as shown in the topology diagram above. Connect the incoming
optical cat or incoming network port to
ETH0
(
WAN
port)
.
●
Step 2: Back Office Login
The H68K
waits for a successful power-up,
the PC PC
cable is connected to the
ETH1
(
LAN
port)
a
n
d
t
h
e
H68K is
wired to access the
H68K
backend.
●
Step 3: Set up
PPPOE
dialing
Click on the [Network] button, click on the [Interface] button and click on [Modify] at the
WAN
port
Translator: GitHub@IcingTomato