Oil Smart® Simplex Panel
Installation Manual
Oil Smart® Simplex System:
The Oil Smart® OSSIM-30 System incorporates pump
controls and alarm sensors that differentiate between
oil and water, allowing companies to responsibly
discharge the water without the risk of pumping oil.
Installation of the Simplex Panel keeps companies
in compliance with Elevator Code ASME A17.1 and
State/Federal regulations while reducing the risk of
adverse publicity, fines and expensive cleanup costs.
OSSIM-30
Single Phase 120/208/240V 60Hz.
(0-16.0 Pump Full Load Amps)
Features:
•
Oil Smart® and Liquid Smart® Controls with 20’
cords and mounting hardware
•
NEMA 4X Panel Enclosure: Heavy Duty
Polycarbonate, 10″x8″x4″, Clear Front
• CSA International Certified No. 229294
•
UL Listed for the United States and Canada
•
High Liquid Alarm with Test and Silence Features,
Red Beacon Alarm Light, White Light for Water
Present, Yellow Light for Oil Present
•
Alarm Horn that Sounds at 85 Decibels at 10 Feet
•
Complete Panel Remote Monitoring Dry Contacts:
Oil, Water, High Liquid
•
HOA Switch and Green Light for Pump Run
Panel and Component Installation:
1. Caution: To maintain the NEMA 4X rating, make
all wiring connections with seal tight cable grips or
conduit connections (supplied by end user).
2. Determine mounting location for control panel. Mount
panel using mounting feet supplied.
3. The control panel should not be mounted in an
area that is subject to submersion.
4. It is recommended to use separate 120VAC sources
for the pump and alarm circuits.
5. Run pump cable, Liquid Smart® cable, and Oil
Smart® cable through conduit. Make field connections
as shown on wiring diagram.
6. Run power line conductor through conduit. Wire to
terminals per enclosed schematic. Branch circuit
protection to be provided by end-user.
7. Mount Oil Smart Pump Control and Liquid Smart
Sensor with provided mounting hardware to pump
discharge pipe. The off sensor of the Oil Smart Switch
shall be positioned at least 3” above the impeller
of the pump. The Liquid Smart Sensor shall be
positioned at the appropriate high liquid level point.
Start up:
1. When power is applied, the green power light located
on the white front swing panel shall light.
2. The Pump HOA Switch shall be placed to the A (auto)
position to ensure the system will pump. The pump
can be tested or turned on manually if the HOA switch
is in the H (Hand-Manual) position.
To test the alarm circuit, push the test button on the front
panel, the audible alarm shall sound and the red beacon
will light.
Service:
Caution: Before checking electrical connections within
the control or attempting to replace any components,
turn off all branch circuits supplying power to the main
control panel.
Protecting the Environment since 1995.
www.seewaterinc.com
or www.oilsmart.org
951.487.8073 • 888.733.9283
Email: [email protected]
121 North Dillon Avenue • San Jacinto, CA 92583
P.O. Box 1269 • San Jacinto, CA 92581
l
a
ci
rt
c
el
E
l
a
n
oi
t
a
N
e
h
t
h
ti
w
e
c
n
a
d
r
o
c
c
a
ni
e
b
t
s
u
m
s
n
oi
t
al
la
ts
ni
ll
A
.
1
Code, and any other applicable state and local electrical
requirements.
1. The switch and pump are not rated for explosive environments.
This product is intended for hydraulic oils only.
IM 701, Rev. 0515