Seconique TOLEDO Скачать руководство пользователя страница 6

PARTS REQUIRED

3 -

x1

LEFT SIDE PANEL 

STEP 6

TOOLS REQUIRED

HARDWARE REQUIRED

3 -

x1

LEFT SIDE PANEL 

STEP 5

PARTS REQUIRED

HARDWARE REQUIRED

TOOLS REQUIRED

A

02

E

10

U

05

G

10

Detail 3

Detail 4

A

O

O

E

SECOND HOLE (LINE UP WITH PRE-DRILLED HOLE)

PRE-DRILLED

       HOLE

O

20

PLEASE NOTE
PRE-DRILLED HOLES

Detail 4

Detail 4

Detail 3

SEC/SH/09/21/HV1

PAGE 06

3

G

G

U

U

G

G

3

O

P

LEFT

Содержание TOLEDO

Страница 1: ...DO NOT USE TOLEDO 5 DRAWER NARROW CHEST ASSEMBLY INSTRUCTIONS IMPORTANT PLEASE READ BEFORE YOU CONTINUE FURTHER CARE AND MAINTENANCE FOR DOMESTIC USE ONLY PAGE 01 SEC SH 09 21 HV1 GREY ...

Страница 2: ...th Back Baseboard Drawer Front Drawer Side Drawer Back Drawer Bo om 1 1 1 2 1 2 5 10 5 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S100 102 144 HV1 02 S100 102 144 HV1 03 S100 102 144 HV1 04 S100 102 144 HV1 05 S100 102 144 HV1 06 S100 102 144 HV1 07 S100 102 144 HV1 08 S100 102 144 HV1 09 S100 102 144 HV1 10 S100 102 144 HV1 11 S100 102 144 HV1 12 S100 102 144 HV1 01 Back Panel SEC SH 09 21 H...

Страница 3: ...SEC SH 09 21 HV1 PAGE 03 2 2 2 1 2 2 1 1 1 2 2 2 2 2 2 1 1 ...

Страница 4: ... STEP 2 2 x1 RIGHT SIDE PANEL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED A 02 O 20 E 10 L K C M Detail 1 Detail 2 Detail 2 Detail 1 Detail 2 Detail 1 Detail 1 Detail 1 Detail 1 Detail 3 Detail 4 A O O E Detail 3 Detail 4 Detail 4 PLEASE NOTE PRE DRILLED HOLES SEC SH 09 21 HV1 PAGE 04 2 2 O P ...

Страница 5: ...E PANEL TOOLS REQUIRED STEP 4 STEP 3 C 05 K 02 L 02 PARTS REQUIRED 2 x1 RIGHT SIDE PANEL HARDWARE REQUIRED TOOLS REQUIRED G 10 U 05 PRE DRILLED HOLE L K C M Detail 1 Detail 2 M 01 Detail 1 Detail 1 Detail 1 Detail 1 Detail 2 Detail 1 Detail 2 SEC SH 09 21 HV1 PAGE 05 2 3 G G G G U U RIGHT ...

Страница 6: ...FT SIDE PANEL STEP 5 PARTS REQUIRED HARDWARE REQUIRED TOOLS REQUIRED A 02 E 10 U 05 G 10 Detail 3 Detail 4 A O O E SECOND HOLE LINE UP WITH PRE DRILLED HOLE PRE DRILLED HOLE O 20 PLEASE NOTE PRE DRILLED HOLES Detail 4 Detail 4 Detail 3 SEC SH 09 21 HV1 PAGE 06 3 G G U U G G 3 O P LEFT ...

Страница 7: ...IRED TOOLS REQUIRED M 01 C 06 HARDWARE REQUIRED 6 x1 FRONT PLINTH PARTS REQUIRED STEP 8 STEP 7 7 x2 BACK BASEBOARD Detail 1 Detail 1 Detail 1 Detail 1 C M Detail 1 Detail 4 A Detail 4 Detail 4 Detail 4 Detail 4 Detail 4 Detail 4 SEC SH 09 21 HV1 PAGE 07 X2 6 7 4 O P ...

Страница 8: ...S REQUIRED HARDWARE REQUIRED 2 x1 RIGHT SIDE PANEL PARTS REQUIRED STEP 10 STEP 9 4 x1 FRONT FRAME Detail 13 Detail 13 Detail 13 Detail 13 B Cam bolt head needs to be in centre Detail 13 B Cam bolt head needs to be in centre Detail 13 Detail 13 Detail 13 SEC SH 09 21 HV1 PAGE 08 2 4 3 ...

Страница 9: ...UIRED TOOLS REQUIRED B 04 HARDWARE REQUIRED 7 x2 BACK BASEBOARD PARTS REQUIRED STEP 11 STEP 12 Detail 13 B Cam bolt head needs to be in centre Detail 4 A Detail 4 Detail 4 Detail 4 Detail 4 Detail 13 Detail 13 Detail 13 Detail 13 SEC SH 09 21 HV1 PAGE 09 7 7 1 O P ...

Страница 10: ...EQUIRED PARTS REQUIRED TOOLS REQUIRED B 04 HARDWARE REQUIRED 1 x1 TOP PANEL PARTS REQUIRED STEP 13 STEP 14 Detail 13 B Cam bolt head needs to be in centre Detail 13 Detail 13 Detail 13 Detail 14 Detail 14 SEC SH 09 21 HV1 PAGE 10 1 ...

Страница 11: ...D 5 x2 SIDE PLINTH HARDWARE REQUIRED TOOLS REQUIRED J 06 PARTS REQUIRED HARDWARE REQUIRED TOOLS REQUIRED 6 x1 FRONT PLINTH Detail 5 Detail 5 Detail 5 12 x1 BACK PANEL PLEASE NOTE PRE DRILLED HOLES SEC SH 09 21 HV1 PAGE 11 5 5 6 12 ...

Страница 12: ... REQUIRED C 40 HARDWARE REQUIRED TOOLS REQUIRED Q 14 I 03 M 01 S 14 Detail 6 Detail 6 Detail 6 Detail 6 Detail 6 Detail 7 Detail 7 9 x10 DRAWER SIDE 10 DRAWER BACK x5 C M Detail 1 Detail 1 Detail 1 Detail 1 Detail 1 Detail 1 Detail 1 SEC SH 09 21 HV1 PAGE 12 X5 X10 9 10 ...

Страница 13: ...EQUIRED HARDWARE REQUIRED TOOLS REQUIRED A 10 HARDWARE REQUIRED TOOLS REQUIRED H 10 8 x5 DRAWER FRONT Detail 4 A 9 x10 DRAWER SIDE 10 x5 DRAWER BACK Detail 9 H Detail 4 Detail 4 Detail 9 Detail 9 SEC SH 09 21 HV1 PAGE 13 X5 X5 8 9 9 10 O P ...

Страница 14: ...D HARDWARE REQUIRED TOOLS REQUIRED B 10 HARDWARE REQUIRED TOOLS REQUIRED L 25 8 x5 DRAWER FRONT Detail 13 Detail 13 B Cam bolt head needs to be in centre X5 11 x5 DRAWER BOTTOM 7 57 5 Detail 10 Detail 10 Detail 10 SEC SH 09 21 HV1 PAGE 14 X5 8 11 ...

Страница 15: ...D HARDWARE REQUIRED TOOLS REQUIRED P 20 HARDWARE REQUIRED TOOLS REQUIRED N 10 Detail 11 U 05 X5 LAST THIRD HOLE THIRD HOLE THIRD HOLE LAST THIRD HOLE X5 T 05 Detail 12 Detail 11 Detail 11 Detail 12 SEC SH 09 21 HV1 PAGE 15 U U P P P P LEFT RIGHT ...

Страница 16: ...STEP 25 STEP 26 PARTS REQUIRED PARTS REQUIRED HARDWARE REQUIRED TOOLS REQUIRED HARDWARE REQUIRED TOOLS REQUIRED D 01 X5 F 01 R 02 SEC SH 09 21 HV1 PAGE 16 F R D ...

Отзывы: