background image

Part Code 

Part Number

Part Description 

Quantity

Carton

01
02
03
04
05

S400-401-067-DS1-01C

Right Chair Side

1

1/1

Le  Chair Side

Seat Pad

Back Rail

Seat Rail

S400-401-067-DS1-02C
S400-401-067-DS1-03C
S400-401-067-DS1-04C
S400-401-067-DS1-05C

1
1
2
2

1/1
1/1
1/1
1/1

A

02

D

E

08

01

B

04

HARDWARE LIST

Ø4,0 x 35CP

PAGE 2

04

04

02

01

05

05

03

PARTS LIST (PER CHAIR)

C

04

8,0 x 30mm

1/+

2/+

1/+

Ø7,0x60mm

SEC/SH/08/20/DS1

TOOLS REQUIRED

GLUE

Содержание RIO DINING TABLE

Страница 1: ...ace hot or chilled items directly on to the surface use a place mat or marking will occur For general cleaning use a duster and do not use detergents of any kind However the surface will need to be re...

Страница 2: ...Description Quantity Carton 01 02 03 04 S400 401 067 DS1 01T Table Top 1 1 1 Table Leg Blue Marking Table Leg Yellow Marking Frame Side 2 2 4 1 1 1 1 1 1 S400 401 067 DS1 02T S400 401 067 DS1 03T S400...

Страница 3: ...01 7 0 x 80mm 02 03 04 ADD GLUE Detail 1 03 ADD GLUE YELLOW BLUE A 01 TOOLS REQUIRED C 02 D 01 7 0 x 80mm PAGE 3 STEP 2 A GLUE Blue Marking Blue Marking Yellow Marking Detail 1 Detail 1 3 x1 TABLE LE...

Страница 4: ...QUIRED 4 x2 FRAME SIDE A 01 C 04 D 01 7 0 x 80mm 04 04 HARDWARE REQUIRED B 08 00000DS CENTRALIZE Yellow Marking Blue Marking Blue Marking 4 0 x 35CP STEP 3 STEP 4 TOOLS REQUIRED TOOLS REQUIRED x2 GLUE...

Страница 5: ...t inferior Do not place this product next to a radiator or in direct sunlight Wood is a natural product and may expand if subjected to damp and may shrink or crack if subjected to heat Therefore it is...

Страница 6: ...Le Chair Side Seat Pad Back Rail Seat Rail S400 401 067 DS1 02C S400 401 067 DS1 03C S400 401 067 DS1 04C S400 401 067 DS1 05C 1 1 2 2 1 1 1 1 1 1 1 1 A 02 D E 08 01 B 04 HARDWARE LIST 4 0 x 35CP PAG...

Страница 7: ...STEP 2 B 02 8x30mm A 01 HARDWARE REQUIRED 2 x1 LEFT CHAIR SIDE 4 x2 BACK RAIL STEP 1 PARTS REQUIRED PAGE 3 04 04 02 05 05 D 04 Detail 1 01 B 02 8x30mm Detail 2 5 x2 SEAT RAIL 7 0x60mm TOOLS REQUIRED T...

Страница 8: ...TEP 4 HARDWARE REQUIRED STEP 3 PAGE 4 D 04 E 01 03 CENTRALIZE 4 0 x 35CP 7 0x60mm TOOLS REQUIRED TOOLS REQUIRED FOR YOUR FUTURE REFERENCE ORDER NUMBER SHOULD BE HERE SEC SH 08 20 DS1 Detail 2 D E Deta...

Отзывы: