background image

STEP 9

PARTS REQUIRED

TOOLS REQUIRED

HARDWARE REQUIRED

B

04

STEP 10

1 -

x1

TOP PANEL

PARTS REQUIRED

TOOLS REQUIRED

HARDWARE REQUIRED

B

04

SEC/SH/08/20/ZF2

Page 08

2 -

x1

BOTTOM PANEL 

B

B

B

1

2

4x45mm

B

4x45mm

Содержание NORDIC 3 DRAWER BEDSIDE

Страница 1: ...NORDIC 3 DRAWER BEDSIDE ASSEMBLY INSTRUCTIONS DO NOT USE SEC SH 08 20 ZF2 Page 01...

Страница 2: ...1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S100 103 055 ZF1 13 13 Shelf Panel Centre Drawer Front 1 1 1 1 14 15 16 17 18 S100 103 055 ZF1 14 S100 103 055 ZF1 15 S100 103 055 ZF1 16 S100 103 055 ZF1 17 S100 103...

Страница 3: ...panel Do not overtighten or undertighten see example below Shoulder Panel Panel HARDWARE LIST SEC SH 08 20 ZF2 Page 03 A No Part Name Qty Wooden Dowel 6x25mm B 45mm Screw 4x45mm C 16mm Screw 3 5x16mm...

Страница 4: ...UIRED E 08 STEP 2 5 x1 RIGHT BOTTOM SIDE PANEL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED 6x25mm A 08 I 02 C 04 SEC SH 08 20 ZF2 Page 04 3 5x16mm 3 x1 SHELF PANEL 4 x1 SHELF PANEL E 4 E E 3 E E A...

Страница 5: ...IRED 6x25mm A 08 I 02 C 04 STEP 4 SEC SH 08 20 ZF2 Page 05 A 9 A 8 I C C I C C A A A A A A 8 x1 LEFT TOP SIDE PANEL I C C I C C A 7 A A A 10 A A A 9 x1 RIGHT CENTRE SIDE PANEL PARTS REQUIRED TOOLS REQ...

Страница 6: ...EP 6 3 x1 SHELF PANEL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED 4x45mm B 02 SEC SH 08 20 ZF2 Page 06 7 x1 RIGHT TOP SIDE PANEL 8 x1 LEFT TOP SIDE PANEL 9 x1 RIGHT CENTRE SIDE PANEL 6 7 8 9 F 08...

Страница 7: ...LS REQUIRED HARDWARE REQUIRED B 04 STEP 8 4 x1 SHELF PANEL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED B 02 SEC SH 08 20 ZF2 Page 07 4x45mm 8 7 B B 8 x1 LEFT TOP SIDE PANEL 4 5 6 5 x1 RIGHT BOTTOM...

Страница 8: ...EP 9 PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED B 04 STEP 10 1 x1 TOP PANEL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED B 04 SEC SH 08 20 ZF2 Page 08 2 x1 BOTTOM PANEL B B B 1 2 4x45mm B 4x45...

Страница 9: ...OOLS REQUIRED HARDWARE REQUIRED C 16 G 04 STEP 12 24 x1 BOTTOM BACK PANEL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED H 34 SEC SH 08 20 ZF2 Page 09 C G G G 3 5x16mm 24 26 25 25 x1 TOP BACK PANEL 2...

Страница 10: ...RAWER BACK E 02 F 02 11 x1 BOTTOM DRAWER FRONT 23 x1 DRAWER BASE 4x38mm 11 x1 BOTTOM DRAWER FRONT STEP 13 PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED A 04 STEP 14 PARTS REQUIRED SEC SH 08 20 ZF2 P...

Страница 11: ...RE REQUIRED A 04 STEP 15 PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED STEP 16 12 x1 TOP DRAWER FRONT PARTS REQUIRED SEC SH 08 20 ZF2 Page 11 17 x1 LEFT TOP DRAWER SIDE 18 x1 RIGHT TOP DRAWER SIDE C...

Страница 12: ...REQUIRED TOOLS REQUIRED HARDWARE REQUIRED D 04 SEC SH 08 20 ZF2 Page 12 18 x1 RIGHT TOP DRAWER SIDE 19 x1 TOP DRAWER BACK 23 x1 DRAWER BASE 4x38mm 23 17 18 19 D D D 12 STEP 18 PARTS REQUIRED TOOLS REQ...

Страница 13: ...20 x1 LEFT CENTRE DRAWER SIDE 21 x1 RIGHT CENTRE DRAWER SIDE E SEC SH 08 20 ZF2 Page 13 STEP 20 20 x1 LEFT CENTRE DRAWER SIDE PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED D 04 21 x1 RIGHT CENTRE D...

Страница 14: ...STEP 15 PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED C 04 I 01 3 5x16mm J 01 C I C I I C C J STEP 21 STEP 22 PARTS REQUIRED SEC SH 08 20 ZF2 Page 14...

Отзывы: