background image

Ø1/4 x 60mm

Ø7 x 90mm

Ø7 x 130mm

Ø1/4 x 80mm

SEC/SW/12/21/DC1

C

B

XXXXX

XXXXX

PARTS REQUIRED

TOOLS REQUIRED

HARDWARE REQUIRED

H

H

08

Page 06

STEP 6

STEP 5

2 -

x2

SIDERAIL

PARTS REQUIRED

TOOLS REQUIRED

HARDWARE REQUIRED

B

B

B

B

C

C

C

04

C

04

1/4

I

02

Ø4,0 x 16mm

I

Ø1/4 x 80mm

2

2

Содержание GREY TOLEDO

Страница 1: ...SEC SW 12 21 DC1 TOLEDO 5 BED ASSEMBLY INSTRUCTIONS Page 01 GREY...

Страница 2: ...anel 1 2 3 Siderail Headboard Right Post Headboard Le Post Headboard Crossbeam Footboard Right Post Footboard Le Post Slats 2 Holes 2 1 1 1 1 1 9 1 3 2 3 2 3 2 3 2 3 2 3 3 3 9 10 Slats 3 Holes Centre...

Страница 3: ...21 DC1 FITTINGS TOOLS REQUIRED G 33 F I 01 02 02 04 26 04 10 C E D B A 08 02 K J H 01 02 L 1 4 8 x 50mm 17mm 1 4 x 80mm 17mm 7 x 130mm SPACER 78mm 4 0 x 16mm 1 4 17mm 1 4 x 60mm 17mm 7 x 90mm 4 0 x 30...

Страница 4: ...BOARD PANEL PARTS REQUIRED 11 12 14 x1 x2 x2 FOOTBOARD PANEL HEAD FOOTBOARD TOP PANEL CENTRE HEADBOARD PANEL A Please assemble on a clean soft surface to avoid damage 8 x 50mm A Please assemble on a c...

Страница 5: ...ARD LEFT POST 6 x1 FOOTBOARD RIGHT POST PARTS REQUIRED 7 x1 FOOTBOARD LEFT POST 11 x1 FOOTBOARD PANEL D 06 D D F F Please assemble on Please assemble on a clean soft surface a clean soft surface to av...

Страница 6: ...80mm SEC SW 12 21 DC1 C B XXXXX XXXXX PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED H H 08 Page 06 STEP 6 STEP 5 2 x2 SIDERAIL PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED B B B B C C C 04 C 04...

Страница 7: ...x 60mm 7 x 90mm 7 x 130mm 1 4 x 80mm G 01 17mm 7 x 90mm F J K PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED Page 07 STEP 8 STEP 7 PARTS REQUIRED TOOLS REQUIRED HARDWARE REQUIRED 10 x1 CENTRE RAIL F...

Страница 8: ...SEC SW 12 21 DC1 STEP 9 TOOLS REQUIRED E E E L 33 L 02 4 0 x 30mm SPACER 78mm L PARTS REQUIRED HARDWARE REQUIRED 8 9 x9 x5 SLATS 2 HOLES SLATS 3 HOLES 9 9 9 9 9 8 8 8 8 8 8 8 8 8...

Отзывы: