
6
1 Using the metal template/mounting bracket
pencil out rectangle to cut out. (Fig.4)
2 Using the drill with a 1/2 inch drill bit drill a
hole along the inside of the marked circle.
(Fig.5)
3 Then using tinsnips cut out the rectangle
(Fig.6).
4 Make sure lamps on the 1000 series units are
pointed in the direction of the airflow. There
are arrows pointing to the direction the air must
pass across the lamps. If not remove the lamps
from the brackets and turn them around.
5 Install mounting plate around opening in duct
with zip screws. (Fig.7)
6 Use the self tapping sheet metal screws to
secure the unit to mounting template. (Fig.8)
7 Make sure the power is off to the blower be-
fore wiring unit.
8
With the switch in the off position wire the unit
direct to a 120/240 vac blower, the EAC termi-
nal or use pressure switch, sail switch. Turn the
switch to the on position.
9 The air purifier is designed to turn on and off
with the forced air blower. (Fig.9) If lamp is
operating the sight glass will illuminate. If it is
not see the troubleshooting section.
•
Installation should be done by a qualified HVAC contractor.
•
Read all safety instructions at the beginning of this manual.
•
Make sure unit is installed so that the UV light
can not
be seen directly through any returns
or supplies.
•
Units should not be installed with in 12-18 inches of any non UV resistant materials. If ma-
terials are in question call manufacturer of said products to see if they are made with UV
inhibitors. Prolonged UV exposure will degrade non UV resistant materials. Non UV resis-
tant materials must be shaded or covered .
1 Marker
2 Tinsnips
3 Drill
4 Drill Bits
5 5/16” &
11/32 “Nut
driver
6 Tape
Measure
7 Metal
Template
and
Mounting
Bracket
Содержание 1000KA
Страница 1: ...1...