
Quick Reference
Chapter 2 Connecting the Tester
The Tester must be powered by a 230V supply.
The supply must include an earth connection via a 3 pin mains plug.
When switched on, the Tester will carry out a short self-test
procedure (approximately 2 seconds). During this test, the following
screen will appear: -
SOFTWARE VERSION: 0.XX
HARDWARE VERSION: 1.YY
Note
Current revision numbers are shown at the bottom of the
screen.
The Tester will then display the Main Menu.
13
Содержание Supernova Plus
Страница 8: ......
Страница 56: ...How to view Test Results appears to the software as a Usercode 48...
Страница 113: ...Testcode Tables Digit 10 Number of Touch Leakage Tests 0 1 1 1 2 2 3 3 4 4 5 5 6 10 7 15 8 20 9 25 A 30 105...
Страница 114: ...Testcode Tables 106...